NR NR/L2/SIG/11201/MOD X13 ISSUE 1 PDF

NR NR/L2/SIG/11201/MOD X13 ISSUE 1 PDF

Name:
NR NR/L2/SIG/11201/MOD X13 ISSUE 1 PDF

Published Date:
09/03/2011

Status:
[ Active ]

Description:

Signalling Design Handbook: Level Crossings - Automatic Open Crossing Locally Monitored Plus Barriers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-sig-11201-mod-x13-issue-1_2782836

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

General Description

Automatic open crossings locally monitored plus Barriers (AOCL + B) are AOCL crossings that have been cost effectively retrofitted with barriers to improve safety at that site. The AOCL + B is an interim crossing type only. When the underlying AOCL equipment becomes due for renewal, the crossing shall be either renewed as an ABCL or to a different type of crossing as determined by the normal renewal and assessment process.

AOCL + B crossings shall fulfil the requirements of the AOCL section except where modified by this section.

To a road user the crossing shall appear to be an ABCL crossing. But there are different failure modes due to the minimum of change to the AOCL circuitry.

Where the road is wide enough the barriers shall be standard half barriers.

Barriers are also intended to be fitted to narrower roads than previously. In this case the half barrier length shall be reduced to maintain an exit gap of 3m minimum measured to the kerb, or 3.2m to the edge of the road where no distinct kerb (or equivalent), is provided. Where even 3.2m cannot be obtained, the gap may be narrowed to a minimum of 1.5m with site specific agreement of the ORR.

Other than to meet the requirements of this section there is no requirement to bring the existing AOCL circuitry up to modern standards. There is no requirement to provide emergency plungers or similar equipment etc.


Edition : 1
File Size : 1 file , 65 KB
Number of Pages : 7
Published : 09/03/2011

History


Related products

NR NR/L3/MTC/MG0180 ISSUE 3
Published Date: 09/01/2018
Maintenance Compliance Indicator Reporting
13.20 €
NR TWI 2S003 ISSUE 1
Published Date: 03/01/2005
How to Recognise Switch Types
7.50 €
NR TPWS/TGN/009 ISSUE 1
Published Date: 04/06/2001
Power Supplies to TPWS at Signals Controlled from Mechanical Signal Boxes
18.60 €
NR X14120 ISSUE 3
Published Date: 12/03/2011
MCB-OD Typical Circuits COD Connections (2) Redwall RLS-3060
5.70 €

Best-Selling Products

JEDEC EIA 318-B
Published Date: 07/01/1996
MEASUREMENT OF REVERSE RECOVERY TIME FOR SEMICONDUCTOR SIGNAL DIODES
17.70 €
JEDEC EIA 323 (R2002)
Published Date: 03/01/1966
AIR-CONVECTION-COOLED, LIFE TEST ENVIRONMENT FOR LEAD-MOUNTED SEMICONDUCTOR DEVICES
15.30 €
JEDEC EIA 365 (R1984)
Published Date: 11/01/1969
PERFORMANCE TEST PROCEDURE FOR SOLAR CELLS AND CALIBRATION PROCEDURE FOR SOLAR CELL STANDARDS FOR SPACE VEHICLE SERVICE
17.70 €
JEDEC EIA 397-1
Published Date: 07/01/1980
ADDENDUM No. 1 TO EIA-397
31.80 €
JEDEC EIA 397
Published Date: 06/01/1972
RECOMMENDED STANDARD FOR THYRISTORS
68.40 €
JEDEC EIA 557B
Published Date: 02/01/2006
STATISTICAL PROCESS CONTROL SYSTEMS
22.20 €