This module covers the following types of work as described in NR/L2/SIG/11201, Module A16:
I. temporary non-conceptual work;
II. short-lived work;
III. stagework progressing towards an approved overall scheme; and
IV. redundant assets left in situ for a limited time (see NR/L2/SIG/11201, Module A16, Section 3:3).
Temporary work is defined as alterations which remain in use for a limited period of time.
Where it is desired to use the relaxation given in NR/L2/SIG/11201, Module A16, Section 3:4, the protection described in NR/L2/SIG/11201, Module A16, Section 3:5 should also be applied.
The following considerations should be addressed by a fully documented process of risk assessment:
a) the time for which the work may remain;
b) the likelihood of future alterations to the temporary work;
c) the possibility of protracted timescales, requiring imposed solutions in the event of slippage; and
d) the introduction of temporary work on life-expired equipment with no maintainability.