NR NR/L2/SIG/11774/SR0001GB ISSUE 1 PDF

NR NR/L2/SIG/11774/SR0001GB ISSUE 1 PDF

Name:
NR NR/L2/SIG/11774/SR0001GB ISSUE 1 PDF

Published Date:
06/02/2012

Status:
[ Active ]

Description:

Clamp Lock Installation Pre-Inspection (aka NR/L2/SIG/11774/A114)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

Introduction

This is a joint inspection to be carried out with the track organisation.

The objective of this inspection is to identify parts that may require renewal or major adjustment. Careful inspection at this stage will mean that you will be fully equipped with both the tools and spares that are required on the day of the Pointcare service.

It should be noted that the Pre-inspection is only an inspection of the equipment (i.e. taking measurements and a general examination) and will not require possession of the points for more than a few minutes.


Edition : 1
File Size : 1 file , 1.3 MB
Number of Pages : 16
Published : 06/02/2012

History


Related products

NR NR/CIV/SD/682 ISSUE D
Published Date: 12/01/2018
Infilling of Arch Underline Bridges with Embankment between Wing Walls
$5.7
NR E10096/45 ISSUE 1
Published Date: 09/01/2004
TYPICAL CIRCUITS FORMER WESTERN REGION OVER-RIDES THROUGH ROUTES GEOGRAPHICAL JC SINGLE ROUTE SELECTIVE
$5.7
NR NR/L3/CIV/140/174N ISSUE 2
Published Date: 06/01/2009
Model Clause 174N: Protective Coating of Timber Surfaces
$5.7
NR BRS-SW 67-C7 ISSUE 3
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Ground Frames Power Operated Points Control Case Layout
$5.7

Best-Selling Products