NR NR/L2/SIG/19608 ISSUE 7 PDF

NR NR/L2/SIG/19608 ISSUE 7 PDF

Name:
NR NR/L2/SIG/19608 ISSUE 7 PDF

Published Date:
05/27/2014

Status:
[ Revised ]

Description:

Level Crossing Asset Inspection and Implementation of Minimum Action Codes

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This process describes a method of inspecting level crossings on Network Rail Managed Infrastructure. It includes:

a) preparing for inspections;

b) undertaking inspections, identifying defects and the minimum actions to be taken on site;

c) recording inspections and defects identified; and

d) managing defect repairs.

It does not apply to authorised walking routes that cross the railway unless they are classified as a staff crossing with white lights. It does not apply to road rail access points or track access points.

Assurance requirements are given in Appendices:

  • A – Annual check that the inspection frequencies in Ellipse are correct
  • B – Checking the quality of repairs to level crossing defects
  • C – Monitoring the timescales for rectifying level crossing defects
  • D – Checking the quality of level crossing inspections

Purpose

This document provides Level Crossing Managers (LCMs) and Delivery Unit staff, see RACI in clause 4, with acceptable means of compliance for the inspection of level crossing assets.

This document assists in the mitigation of the following high level risk:

  • Level Crossings: vehicle, person or animal on the line at risk of collision.

The inspections form part of a multi-disciplinary process that demonstrate that level crossings remain safe, reliable and legally compliant.


Edition : 7
File Size : 1 file , 1.1 MB
Number of Pages : 41
Published : 05/27/2014

History

NR NR/L2/XNG/19608 ISSUE 8
Published Date: 09/04/2021
Inspection of Level Crossing Systems (aka NR/L2/SIG/19608)
$13.2
NR NR/L2/SIG/19608 ISSUE 7
Published Date: 05/27/2014
Level Crossing Asset Inspection and Implementation of Minimum Action Codes
$18.6

Related products

NR NR/L3/INI/P3M/129 ISSUE 1
Published Date: 06/02/2018
Planning and Scheduling Manual
$13.2
NR SMF/PL/0038 ISSUE 1
Published Date: 02/01/2006
Notice (SCO)
$5.7
NR SSI8003-102A ISSUE 1
Published Date: 12/01/2002
SSI Data Preparation - Core Data for Level Crossings - Bi-Directional Track - One Signal (aka RT/SSI/8003-102A)
$7.5
NR T28225 ISSUE 3
Published Date: 06/10/2009
Lineside & on Track Equipment Typical Circuits Signals & Indicators Auto Aspect Sequence: Entering Interlocking; Junction Signal Approach Controlled from Red
$5.7

Best-Selling Products