NR NR/L2/SIG/19820/F05 ISSUE 1 PDF

NR NR/L2/SIG/19820/F05 ISSUE 1 PDF

Name:
NR NR/L2/SIG/19820/F05 ISSUE 1 PDF

Published Date:
06/05/2021

Status:
[ Active ]

Description:

Signalling and Level Crossing Product Specifications: Batteries for Off-Grid Power Supply Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This specification applies to any organisation involved in the supply of batteries or cells to make up a battery. It applies to any organisation that proposes to supply Network Rail with batteries or cells for use in Off-Grid Power Supply Systems that will be treated as a controlled product requiring product acceptance in line with NR/L2/RSE/100/05.

Purpose

This specification sets out the technical requirements of batteries or cells to make up a battery for use in Off-Grid Power Supply Systems, in line with current Network Rail standards and procedures to confirm a product offered is the best solution for Network Rail.


Edition : 1
File Size : 1 file , 230 KB
Number of Pages : 9
Published : 06/05/2021

History


Related products

NR NR/L2/RMVP/0200/P025 ISSUE 2
Published Date: 06/02/2012
Plant Operations Manual: Dynamic Brake Testing of Road-Rail Vehicles
$13.2
NR X60730 ISSUE 1
Published Date:
MSL Crossing Typical Circuits - Controls (1), (Double Line)
$5.7
NR NR/PS/TEL/00015 ISSUE 3
Published Date: 04/01/2006
Unit Twin Copper Telecommunications Cable
$18.6
NR NR/L3/MTC/RCS0216/GA03 ISSUE 3
Published Date: 06/07/2014
Risk Control Manual: LOWS - Use of the Back Pack Aerial Harness and ZPW or ZFH Units. Use of Booster Aerial
$5.7

Best-Selling Products

CII BMM2001-10
Published Date:
Impacts of Design/Information Technology on Building and Industrial Projects
$36
CII BMM2002-10
Published Date: 11/01/2002
Measuring the Impacts of the Delivery System on Project Performance -- Design-Build and Design-Bid-Build
$36
CII BMM2002-3
Published Date: 02/01/2002
Benchmarking and Metrics Summary Report for 2001
$36
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII BMM2006-10
Published Date: 07/01/2006
Lessons Learned in the Implementation of Best Practices for Project Security
$36
CII BMM2006-11
Published Date: 11/01/2006
Impacts of Automation and Integration Technologies on Project and Company Performance
$36