NR NR/L2/SIG/30009/E810 ISSUE 3 PDF

NR NR/L2/SIG/30009/E810 ISSUE 3 PDF

Name:
NR NR/L2/SIG/30009/E810 ISSUE 3 PDF

Published Date:
12/07/2019

Status:
[ Active ]

Description:

Signalling Principles Handbook: Reasonable Opportunity Assessment for Signalling Alterations

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module provides methods and guidance in the identification of reasonable opportunities when works are proposed that affect or change the signalling assets or its records.

It applies to all works affecting signalling assets, including level crossings and S&C renewal. These include when:

a) equipment is renewed;

b) alterations are made to the layout;

c) layouts are re-signalled or relocked;

d) additional routes are provided;

e) lines are re-controlled.

This excludes individual component replacement under maintenance testing or functionally equivalent design.

Purpose

The purpose of this module is to critically examine project scope at a time in the design development whereby it is practicable to consider amending its limits. It challenges a preconceived belief that perpetuating existing arrangements is always tolerable. It encourages consideration of what may be reasonable to include, and highlights to the asset owner the residual risks that remain.

Following this module will reduce the post-project residual risk, be it performance, technical or safety related. It may give financial benefit in the short and long term depending on the merits identified for reasonable opportunity.


Edition : 3
File Size : 1 file , 390 KB
Number of Pages : 18
Published : 12/07/2019

History


Related products

NR NR/L3/OCS/044/FS-23E ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Emergency Planning - Procedure for Managing Incidents: Security Alert (Suspicious Package Identified Using "Hot" Procedure)
$5.7
NR E10004/10 ISSUE 2
Published Date: 09/01/2004
Typical Circuits Former Western Region Approach Locking 'When Operated' Approach Locking (St16 Timer Shown)
$5.7
NR NR/L2/TRK/001/MOD11 ISSUE 11
Published Date: 03/05/2022
Inspection and Maintenance of Permanent Way: Track Geometry - Inspections and Minimum Actions
$18.6
NR NR/L3/MTC/II0219/01 ISSUE 4
Published Date: 06/03/2023
Design, Configuration, Installation, Commissioning and Calibration of Intelligent Infrastructure Remote Condition Monitoring
$7.5

Best-Selling Products

NIST JANAF Thermochemical Tables
Published Date: 08/01/1998
$58.5