Name:
NR NR/L2/SIG/30009/GKRT0060 ISSUE 3 PDF
Published Date:
12/05/2020
Status:
[ Withdrawn ]
Publisher:
Network Rail
Only the requirements contained in GK/RT0060 parts C7 and C8 and Appendix 2 are to be complied with; the table below clarifies where the requirements in each section are now contained.
Purpose
As part of the filtering exercise carried out by RSSB, it was found that a number of mandatory requirements contained in GK/RT0060 were out of scope of the Railway Group Standards Code as being single duty holder responsibilities. This a result, the Railway Group Standard was withdrawn by RSSB.
| Edition : | 3 |
| File Size : | 1 file , 330 KB |
| Number of Pages : | 38 |
| Published : | 12/05/2020 |