NR NR/L2/SIG/30009/H060 ISSUE 3 PDF

NR NR/L2/SIG/30009/H060 ISSUE 3 PDF

Name:
NR NR/L2/SIG/30009/H060 ISSUE 3 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Train Protection and Automatic Warning Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module primarily reflects multiple aspect signalling to which Track Circuit Block Regulations apply, controlled from a route setting panel or VDU system. The concepts also apply to other interlocking and block systems. Any significantly different / additional considerations to other forms of signalling are specifically identified.

This Module and those directly associated with it equally apply to railway which is ETCS fitted unless there are no applicable lineside signals. 

NOTE 1: The principles appropriate to Modular Signalling are as specified within the functional requirements of NR/L2/SIG/30097/Appx C which references those standards extant in April 2014 and therefore is not affected by the publication of this module.

NOTE 2: The controls and proving arrangements for AWS and TPWS for other block systems are described in this module. For TPWS and its indication to signallers see also NR/L2/SIG/10133.

This module applies to all command and control equipments (see the typical listing in NR/L2/SIG/30009/A100 Section C1.2) for new provision and, subject to consideration of "using reasonable opportunity" and practicability, all alterations to signalling where the changes appreciably alter the risk associated with the layout and with any of the signals within the scheme. 

Changes to layout risk are likely when any of the following apply:

a) alterations are made to a layout;

b) lines become designated as passenger;

c) layouts are re-signalled or relocked (or re-controlled, though it is recognised that the opportunity to mitigate existing risk is generally limited);

d) additional routes are provided;

e) platforms are added;

f) permissible or attainable speeds are changed, whether raised or lowered;

g) an overrun or timetable risk assessment (or similar) identifies the need to review protection.

This module applies to all new provision and, subject to consideration of "using reasonable opportunity" and practicability, all alterations to signalling where the changes appreciably alter the layout risk associated with any of the signals within the scheme. 

This module defines the requirements for:

a) the control of the train protection and warning system, TPWS;

b) the control of other systems of train protection employed on the network;

c) the control of the (BR) Automatic Warning System, AWS;

d) the proving and indication of a) to c).

Where the content of application standards (such as NR/L2/SIG/11201, SSI8003, NR/GN/SIG/CAT0005) are different to the requirements described in this standard this standard takes precedence. 

Purpose 

This module forms part of the Signalling Principles Handbook (NR/L2/SIG/30009) and is to be read in conjunction with the other modules of the handbook. See especially Module A060, and A200 which refers to legacy practices. 

The SPH details Network Rail’s requirements for the provision of interlocking between signals, movable infrastructure such as points and other parts of the signalling system to control the risk of: 

 a) failure of moving infrastructure to establish a wheeled path;

 b) collision between a train and another train legitimately present;

 c) the issuing of a movement authority to the train driver and its subsequent removal. 

The SPH comprises mandatory sections and guidance. The guidance is to be followed unless an alternative can be demonstrated to be beneficial and no less safe. It satisfies the relevant parts of the IRSE Fundamental Requirements for Train Control Systems.


Edition : 3
File Size : 1 file , 450 KB
Number of Pages : 22
Published : 09/07/2024

History

NR NR/L2/SIG/30009/H060 ISSUE 3
Published Date: 09/07/2024
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Train Protection and Automatic Warning Systems
$13.2
NR NR/L2/SIG/30009/H060 ISSUE 2
Published Date: 12/04/2021
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Train Protection and Automatic Warning Systems - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2
NR NR/L2/SIG/30009/H060 ISSUE 1
Published Date: 12/05/2020
Signalling Principles Handbook: Command and Control System; Control System and Interlocking Platforms - Train Protection and Automatic Warning Systems
$13.2

Related products

NR NR/L3/MTC/ME0201/CAL268 ISSUE 1
Published Date: 06/07/2008
Calibration of Megger D201 Ducter Digital Ohm Meter (20 Ohm)
$5.7
NR NR/CIV/SD/630 ISSUE B
Published Date: 09/02/2017
Typical Spalled Concrete Repairs
$5.7
NR BRS-SM 502 ISSUE F
Published Date: 07/20/1986
Rail Clamp Point Lock Lock & Detector Arm Assembly Type 'A'
$5.7
NR X00029 ISSUE 1
Published Date: 02/06/1999
AHBC Typical Circuits Methods to Overcome Potential Timing Problems (2)
$5.7

Best-Selling Products