NR NR/L2/SIG/30014/B210 ISSUE 3 PDF

NR NR/L2/SIG/30014/B210 ISSUE 3 PDF

Name:
NR NR/L2/SIG/30014/B210 ISSUE 3 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Appointment of Signalling Works Testing Sentinel Competence Management System Authorisers

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This Level 2 standard applies to all projects to alter Network Rail’s infrastructure, or with the potential to affect the fitness for purpose of the Network Rail Infrastructure. It is mandatory for all work with signalling content which requires testing to NR/L2/SIG/30014. 

Purpose 

This document is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling works testing activities. 

This Level 2 document sets the requirements for the appointment of Network Rail Signalling Works Testing Sentinel Competence Management System Authorisers. 

Network Rail Signalling Works Testing Sentinel Competence Management System is managed in accordance with NR/L2/SIG/50035/08, and shall be endorsed by a Sponsor and an Authoriser. The Sponsor provides the Employer’s endorsement that an individual is authorised to act as a Signalling Works Tester on behalf of the employing company, and the Authoriser confirms that the technical competence requirements have been met on Network Rail’s behalf.


Edition : 3
File Size : 1 file , 380 KB
Number of Pages : 10
Published : 09/07/2024

History

NR NR/L2/SIG/30014/B210 ISSUE 3
Published Date: 09/07/2024
Appointment of Signalling Works Testing Sentinel Competence Management System Authorisers
$7.5
NR NR/L2/SIG/30014/B210 ISSUE 2
Published Date: 12/03/2011
Appointment of Signalling Works Testing Certificate of Competency Authorisers - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$7.5

Related products

NR BRS-SM 2216/1 ISSUE A
Published Date: 10/04/1991
Rail Clamp Point Lock Adaptor Block for FB Vertical Track
$5.7
NR BRS-SM 633 ISSUE E
Published Date: 04/30/1992
Temporary Speed Restriction Warning Arrangements Fixed Clamp for N.S. Magnet Support
$5.7
NR BRS-SM 2314
Published Date: 03/05/1994
Swing Nose Crossing (MK7) Back-Up Detection Rodding Assembly
$5.7
NR SSI8003-10H ISSUE 6
Published Date: 09/03/2022
SSI Interlocking - Timing Constraints, Failures and Related Documentation
$13.2

Best-Selling Products

AOAC METHODS
Published Date: 01/01/2002
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/2007
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/1990
AOAC OFFICIAL METHODS OF ANALYSIS
$135
AOAC METHODS
Published Date: 01/01/1995
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/2006
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/1999
AOAC OFFICIAL METHODS OF ANALYSIS