NR NR/L2/SIG/30014/C510 ISSUE 2 PDF

NR NR/L2/SIG/30014/C510 ISSUE 2 PDF

Name:
NR NR/L2/SIG/30014/C510 ISSUE 2 PDF

Published Date:
12/07/2019

Status:
[ Active ]

Description:

Signalling Works Testing Handbook: Handover for Signalling Works Testing

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This document applies to work that meets the selection criteria for NR/L2/SIG/30014/A110 or NR/L2/SIG/30014/A210 as defined in NR/L2/SIG/30014/A100.

Purpose

This document is part of the suite of documents contained within the Signalling Works Testing Handbook, NR/L2/SIG/30014, which together detail the requirements for signalling works testing activities.

This document specifies requirements for Handover for Signalling Works Testing of an Installation from the responsible Construction Manager.


Edition : 2
File Size : 1 file , 300 KB
Number of Pages : 11
Published : 12/07/2019

History


Related products

NR NR/L2/SIG/30014/B410 ISSUE 2
Published Date: 06/02/2012
Signalling Works Testing Staff Competence Assessment - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR SSIDIS172 ISSUE 2
Published Date: 01/23/2013
Sequential Operation of Point Ends
$13.2
NR X74580 ISSUE 1
Published Date: 03/03/2012
MCB-OC(RTL) TYPICAL CIRCUITS 2 BARRIER DETECTION CIRCUITS
$5.7
NR BR 820
Published Date: 08/01/1974
Specification for Colours of Light Signals, Colour Filters and Lenses
$13.2

Best-Selling Products