Name:
NR NR/L2/SIG/30014/D115/DT1-04 ISSUE 2 PDF
Published Date:
12/05/2020
Status:
[ Active ]
Publisher:
Network Rail
PURPOSE:
CHECK FOR CORRECT LABELLING confirms new and altered existing equipment is inspected to Check that the labelling is correct.
NOTE: This list is not exhaustive and other equipment specific labelling checks might be required as specified in Test Specifications.
NOTE: Equipment includes cables and wires, and wiring trunking.
Labelling is referred to in three contexts in Signal Works Test Specifications:
• The labelling of equipment to determine its function, e.g. relay label on a rack: “34 HR”.
• The labelling of wires or cables terminated on equipment or links.
• The provision of additional labels.
Related Standards: BS 7671:2018 Requirements for Electrical Installations; NR/L3/SIGELP/27427 Identification and Colours for Signalling Power Distribution Cables.