NR NR/L2/SIG/30014/D115/DT3-52 ISSUE 3 PDF

NR NR/L2/SIG/30014/D115/DT3-52 ISSUE 3 PDF

Name:
NR NR/L2/SIG/30014/D115/DT3-52 ISSUE 3 PDF

Published Date:
05/26/2023

Status:
[ Active ]

Description:

Signalling Works Testing Handbook: Defined Function Test - Point Current and Motor Timer Cut-Off Tests

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
CONTAINS TI 182

PURPOSE:

These tests confirm the correct local functioning of point current and motor cut-off circuits.

NOTE: The following tests can be performed at the same time.


Edition : 3
File Size : 1 file , 300 KB
Number of Pages : 6
Published : 05/26/2023

History

NR NR/L2/SIG/30014/D115/DT3-52 ISSUE 3
Published Date: 05/26/2023
Signalling Works Testing Handbook: Defined Function Test - Point Current and Motor Timer Cut-Off Tests
$7.5
NR NR/L2/SIG/30014/D115/DT3-52 ISSUE 2
Published Date: 09/06/2014
Signalling Works Testing Handbook: Defined Function Test - Point Current and Motor Timer Cut-Off Tests
$5.7

Related products

NR NR/CIV/SD/1921 ISSUE D
Published Date: 09/02/2017
Underbridge Walkways: Service Trough
$5.7
NR NR/L2/SIG/11400/ER/R/1/0183 ISSUE 6
Published Date: 09/04/2021
HPSS Spares Catalogue
$35.4
NR BR 1051
Published Date: 08/01/1969
Covering Vitreous Enamel Signs
$5.7
NR NR/CIV/SD/2138-4 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 9.4m Internal Unit Setting Out Details - Skew 45°
$5.7

Best-Selling Products

API 062 (DP)
Published Date: 10/01/1990
An Historical Overview of Solid Waste Management in the Petroleum Industry
$4.5
API 083 (RS)
Published Date: 08/01/1996
Octane Requirements of the Motor Vehicle Fleet and Gasoline Grade Sales
$4.5
API 10A Addendum 1
Published Date: 04/01/2000
Addendum 1 - Specification for Cements and Materials for Well Cementing
Free Download
API 10A Addendum 2
Published Date: 12/01/2000
Addendum 2 - Specification for Cements and Materials for Well Cementing - Also Incorporates Addendum 1
$4.2
API 10B Addendum 1
Published Date: 10/01/1999
Addendum 1 - Recommended Practice for Testing Well Cements
Free Download
API 10B Addendum 2
Published Date: 11/01/2000
Addendum 2 - Recommended Practice for Testing Well Cements
Free Download