Name:
NR NR/L2/SIG/30014/D120/HS6-01 ISSUE 1 PDF
Published Date:
09/06/2014
Status:
[ Revised ]
Publisher:
Network Rail
General
This handover specification sets out the process, requirements and responsibilities for the mechanical setting up of points and the subsequent handover from signalling installation to Signalling Works Testing.
General definitions of terms are given in NR/L2/SIG/30014/E110, however terms specific to this specification are defined in the last section of this specification.
| Edition : | 1 |
| File Size : | 1 file , 33 KB |
| Number of Pages : | 1 |
| Published : | 09/06/2014 |