NR NR/L2/SIG/30014/D120/TS16-01 ISSUE 1 PDF

NR NR/L2/SIG/30014/D120/TS16-01 ISSUE 1 PDF

Name:
NR NR/L2/SIG/30014/D120/TS16-01 ISSUE 1 PDF

Published Date:
12/01/2012

Status:
[ Revised ]

Description:

Signalling Works Testing: Scheme Plan Verification Test Specification

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L2/SIG/30014/D120/TS16-01

General

This test specification is formed of the following sections, which correlate to the competency levels identified in NR/L2/SIG/30014/B410 for this type of equipment or testing.

• Miscellaneous – Scheme Plan (SP) Verification

General definitions of terms are given in NR/L2/SIG/30014/E110, however terms specific to this specification are defined below.

These tests may be carried out as part of Trackside Equipment Testing or as a discrete activity in accordance with this Test Specification. The Test Plan shall describe the method selected for verification of the scheme plan.

$ = The use of Test Certificate associated with this Test Specification is not mandated in all cases; it may not be appropriate for smaller scale works. Where the Test Certificate is not used, the Master Test Certificate shall be endorsed "N/A" in the number of sheets column, and the Tester shall the sign for the satisfactory completion of testing directly on the Master Test Certificate.


Edition : 1
File Size : 1 file , 38 KB
Number of Pages : 2
Published : 12/01/2012

History

NR NR/L2/SIG/30014/D120/TS16-01 ISSUE 2
Published Date: 06/04/2022
Signalling Works Testing: Signalling Scheme Plan Verification Test Specification
$5.7
NR NR/L2/SIG/30014/D120/TS16-01 ISSUE 1
Published Date: 12/01/2012
Signalling Works Testing: Scheme Plan Verification Test Specification
$5.7

Related products

NR E10007/20 ISSUE 2
Published Date: 09/01/2004
Typical Circuits Former Western Region Signal Control Circuits Non-Vital Through Circuits from Panel to Interlocking
$5.7
NR NR/CIV/SD/204 ISSUE E
Published Date: 09/02/2017
Retaining Walls: Sheet Pile Wall
$5.7
NR NR/L3/ELP/3091/MOD03 ISSUE 1
Published Date: 09/07/2019
DC Conductor Rail Electrified Lines Working Instructions: Planning of Conductor Rail Isolations
$7.5
NR NR/L3/MTC/EP0184 ISSUE 1
Published Date: 06/01/2008
The Removal and Reporting of OLE Defects by the OCR Team
$7.5

Best-Selling Products

TELCORDIA FR-RTP-1-CD-21-100USERS
Published Date: 02/01/2003
Release to Pivot (RTP) Family of Requirements (RTPFR), FR-RTP-1
TELCORDIA FR-SONET-17-CD-1USER
Published Date: 02/01/2003
Broadband and Transport Network Generic Requirements: SONET and ATM Transport Technologies
TELCORDIA FR-SONET-17-CD-6-20USER
Published Date: 02/01/2003
Broadband and Transport Network Generic Requirements: SONET and ATM Transport Technologies
TELCORDIA GR-1009
Published Date: 11/01/1994
Generic Requirements for Fiber Optic Clip-on Test Sets
TELCORDIA GR-1031
Published Date: 10/01/1997
OTGR Section 15.6: Operations Interfaces Using OSI Tools: Test Access Management
TELCORDIA GR-1042
Published Date: 12/01/1998
Generic Requirements for Operations Interfaces Using OSI Tools - Information Model Overview: Synchronous Optical Network (SONET) Transport Information Model