NR NR/L2/SIG/30014/D120/TS6-61 ISSUE 1 PDF

NR NR/L2/SIG/30014/D120/TS6-61 ISSUE 1 PDF

Name:
NR NR/L2/SIG/30014/D120/TS6-61 ISSUE 1 PDF

Published Date:
03/03/2018

Status:
[ Revised ]

Description:

Signalling Works Testing Handbook: HPSS Signalling Works Testing Specification

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
NR/L2/SIG/30014/D120/TS6-61

General

This test specification is formed of the following sections, which correlate to the competency levels identified in NR/L2/SIG/30014/B410 for this type of equipment or testing.

1. Inspection.

2. Wire Count and Continuity

3. Mechanical Set Up (Mech SU)

4. Function Test.

5. Correspond.

General definitions of terms are given in NR/L2/SIG/30014/E110, however terms specific to this specification are defined in the last section of this specification

HPSS is the High Performance Switch System, comprising the HPSA point machine and the PowerLink Backdrive. HPSA is the High Performance Switch Actuator, and is always installed at the Bearer 1 position. PowerLink Backdrive is a supplementary drive system that comprises hollow bearers, stretcher bars (plain and driven), bearing blocks, and a torque tube


Edition : 1
File Size : 1 file , 430 KB
Number of Pages : 11
Published : 03/03/2018

History

NR NR/L2/SIG/30014/D120/TS6-61 ISSUE 2
Published Date: 09/04/2021
Signalling Works Testing Handbook: HPSS Signalling Works Testing Specification
$13.2
NR NR/L2/SIG/30014/D120/TS6-61 ISSUE 1
Published Date: 03/03/2018
Signalling Works Testing Handbook: HPSS Signalling Works Testing Specification
$13.2

Related products

NR NR/GN/INI/0301/03 ISSUE 1
Published Date: 03/02/2019
Integrated Engineering Lifecycle for Projects Phase C Supporting Information
$13.2
NR NR/CIV/SD/2242 ISSUE C
Published Date: 09/02/2017
Conarch Overbridge: General Arrangement Road Surfacing And Waterproofing Details Sheet 2
$5.7
NR NR/L2/TRK/001/MOD01 ISSUE 8
Published Date: 09/04/2021
Inspection and Maintenance of Permanent Way: Glossary
$13.2
NR RT/ETE/3/A/8
Published Date: 03/17/1998
Arrangement of Angle Bracket Attachment to Connect Positive Track Cables to Steel Conductor Rails
$5.7

Best-Selling Products

Hydraulic Modeling: Concepts and Practice
Published Date: 01/01/2000
$27.6
Retaining & Flood Walls
Published Date: 03/01/1994