NR NR/L2/SIG/30014/E110 ISSUE 4 PDF

NR NR/L2/SIG/30014/E110 ISSUE 4 PDF

Name:
NR NR/L2/SIG/30014/E110 ISSUE 4 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Signalling Works Testing Glossary

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-sig-30014-e110-issue-4_2915221

Choose Document Language:
18.60 €
Need Help?
PDF ONLY

This Module applies to all Projects to alter, or with the potential to affect the fitness for purpose of, Network Rail’s infrastructure that meet the selection criteria defined in NR/L3/SIG/10064 NR/GI/T001 (Testing – General) for testing to NR/L2/SIG/30014. 

The inclusions and exclusions documented in NR/L2/SIG/30014/A110 also apply to the scope of this Module. 

Purpose 

This Module supports the Signalling Works Testing Handbook NR/L2/SIG/30014 in providing the glossary used in the instructions and guidance to Signalling Works Testers on the mandatory procedures and process controls so that new signalling installations, and alterations to existing installations, are independently tested in a manner that confirms: 

• Compliance with the Project Concept Design and Engineering Details, and fitness for purpose before the signalling system is offered for Entry Into Operational Service 

This glossary also, as far as practicable, specifies consistent terms used in the procedures and process controls specified in the Signalling Works Testing Handbook NR/L2/SIG/30014. 


Edition : 4
File Size : 1 file , 680 KB
Number of Pages : 37
Published : 09/07/2024

History

NR NR/L2/SIG/30014/E110 ISSUE 4
Published Date: 09/07/2024
Signalling Works Testing Glossary
18.60 €
NR NR/L2/SIG/30014/E110 ISSUE 3
Published Date: 06/04/2022
Signalling Works Testing Glossary - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
18.60 €
NR NR/L2/SIG/30014/E110 ISSUE 2
Published Date: 06/02/2012
Signalling Works Testing Glossary
18.60 €

Related products

NR NR/L2/ELP/21085 ISSUE 7
Published Date: 03/02/2024
Earthing and Bonding on A.C. Electrified Railways
35.40 €
NR RT/E/PS/11765 ISSUE 1
Published Date: 12/01/2000
Impedance Bonds (aka NR/PS/SIG/11765)
24.30 €
NR NR/CIV/SD/2804 ISSUE C
Published Date: 09/02/2017
Modular Overbridge Design: Reinforced Concrete Parapet Sheet 1 of 2
5.70 €
NR T25715 ISSUE 5
Published Date: 06/02/2018
Lineside and On Track Typical Circuits - Points - Hy-Drive - SSI - Single/Double End Indirect Drive - Location Interface Circuits, Preferred Option
5.70 €

Best-Selling Products

IFAI CPAI-75
Published Date:
Rate of Burn Specifications for Sleeping Bags
60.00 €
IFAI CPAI-84
Published Date: 01/01/2021
Specification for Flame-resistant Materials Used in Camping Tentage
IFAI MARINE FABRICATOR DESIGN
Published Date:
Marine Fabricator Design & Fabrication Manual
17.40 €
IFAI STATE OF THE INDUSTRY
Published Date: 01/01/2021
State of the Industry
187.80 €
IFAI USIFI-DTL 55308A
Published Date: 03/16/2010
Detail Specification — Cloth and Strip, Laminated or Coated, Vinyl, Reinforced, High Strength, Flexible
37.20 €