NR NR/L2/SIG/30014 ISSUE 20 PDF

NR NR/L2/SIG/30014 ISSUE 20 PDF

Name:
NR NR/L2/SIG/30014 ISSUE 20 PDF

Published Date:
06/04/2022

Status:
[ Revised ]

Description:

Signalling Works Testing Handbook

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This Handbook applies to all maintenance or project works to alter Network Rail’s signalling infrastructure, or with the potential to affect the fitness for purpose of the Network Rail Infrastructure that meets the selection criteria as defined in NR/L3/SIG/10064 NR/GI/T001.

Purpose

This document mandates the application of the sections of the Signalling Works Testing Handbook.

It provides requirements and guidance on the procedures and process controls necessary to confirm that new signalling installations, and alterations to existing installations, are independently tested in a manner that assures:

• The Health and Safety of Network Rail employees, supply chain and others affected by its activities; and

• Compliance with the project Concept Design and Engineering Details; and

• Fitness for purpose before they are offered for Entry into Operational Service.

The Signalling Works Testing Handbook has been created to collate together all the documents describing the procedures and process controls for signal works testing that are, as far as practicable, consistent across the Network Rail managed infrastructure.


Edition : 20
File Size : 1 file , 1.2 MB
Number of Pages : 49
Published : 06/04/2022

History

NR NR/L2/SIG/30014 ISSUE 23
Published Date: 09/07/2024
Signalling Works Testing Handbook
$18.6
NR NR/L2/SIG/30014 ISSUE 22
Published Date: 05/26/2023
Signalling Works Testing Handbook - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L2/SIG/30014 ISSUE 21
Published Date: 05/26/2023
Signalling Works Testing Handbook
$18.6
NR NR/L2/SIG/30014 ISSUE 20
Published Date: 06/04/2022
Signalling Works Testing Handbook
$18.6
NR NR/L2/SIG/30014 ISSUE 19
Published Date: 09/04/2021
Signalling Works Testing Handbook
$18.6
NR NR/L2/SIG/30014 ISSUE 18
Published Date: 06/05/2021
Signalling Works Testing Handbook
$18.6
NR NR/L2/SIG/30014 ISSUE 17
Published Date: 12/05/2020
Signalling Works Testing Handbook
$18.6
NR NR/L2/SIG/30014 ISSUE 16
Published Date: 03/07/2020
Signalling Works Testing Handbook
$18.6

Related products

NR NR/GN/ELP/27020 ISSUE 2
Published Date: 04/01/2006
Design and Installation of Steel Conductor Rail & Associated Equipment on DC Electrified Lines
$18.6
NR NR/L2/RMVP/0140 ISSUE 1
Published Date: 12/05/2009
Design & Installation of Turntables
$13.2
NR BRS-SM 247 ISSUE C
Published Date: 02/22/1990
Jaw End (for Vertical Crank) with Flange for Insulated Joint
$5.7
NR T60137 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Indicators - Standard Route Ind. (F. O. 1 Indication). Acc: Electronic Interface (Pot/ Laps) Peripheral Location Circuit
$5.7

Best-Selling Products