NR NR/L2/SIG/30035 ISSUE 4 PDF

NR NR/L2/SIG/30035 ISSUE 4 PDF

Name:
NR NR/L2/SIG/30035 ISSUE 4 PDF

Published Date:
09/07/2019

Status:
[ Revised ]

Description:

Signalling and Level Crossing Scheme Approval Process

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This business process defines the approval process to be adopted in respect of all Signalling Schemes that make alterations or otherwise impact on the functionality of signalling installations on Network Rail Managed infrastructure.

The process is to be applied to all Works affecting Network Rail Signalling and level crossing infrastructure. The Network Rail Designated Project Engineer (defined in NR/L2/INI/02009) is responsible for application of this process. The requirement for approval of signalling schemes and level crossing protection applies to all projects which make alterations to Network Rail signalling installations irrespective of what organisation or discipline is sponsoring the works.

Level crossing ground plans are not within the scope of this review process although a draft ground plan will be a document used in the review of level crossing protection arrangements.

Purpose

This business process delivers signalling and level crossing schemes that are consistent in interpretation and application of principles across the Network. The application of this business process gives a level of assurance that the signalling proposal and the protection system choice for level crossing is fit for purpose.

This review process also forms part of the Safety Verification Process, as required by the ROGS regulations or TSIs (as appropriate). This business process supports the requirements of company standards particularly those relating to the signalling design process in NR/L2/SIG11201.


Edition : 4
File Size : 1 file , 570 KB
Number of Pages : 33
Published : 09/07/2019

History

NR NR/L2/SIG/30035 ISSUE 5
Published Date: 09/04/2021
Signalling and Level Crossing Scheme Approval Process
$18.6
NR NR/L2/SIG/30035 ISSUE 4
Published Date: 09/07/2019
Signalling and Level Crossing Scheme Approval Process
$18.6

Related products

NR X70050 ISSUE 4
Published Date: 04/07/2007
MCB Typical Circuits Barrier Control Circuits (4)
$5.7
NR X70240 ISSUE 3
Published Date: 04/02/2005
MCB Typical Circuits Barrier Pedestal Wiring
$5.7
NR NR/L3/CIV/00012 ISSUE 3
Published Date: 12/03/2022
Management of Road Vehicle Incursions (RVI)
$18.6
NR BRS-SM 365/2 ISSUE C
Published Date: 06/08/1989
Insulating Bush for Point Drive Bar
$5.7

Best-Selling Products

VDI/VDE/DGQ 2618 Sheet 1.1
Published Date: 12/01/2001
Inspection of measuring and test equipment - Instructions to inspect measuring and test equipment for geometrical quantities - Basic principals
VDI/VDE/DGQ 2618 Sheet 1.2
Published Date: 12/01/2003
Inspection of measuring and test equipment - Instructions for the inspection of measuring and test equipment for geometrical quantities - Uncertainty of measurement
VDI/VDE/DGQ 2618 Sheet 10.1
Published Date: 11/01/2001
Inspection of measuring and test equipments - Test instructions for micro meters
VDI/VDE/DGQ 2618 Sheet 10.2 - DRAFT
Published Date: 07/01/2005
Draft Document - Inspection of measuring and test equipment - Test instruction for micro meters for screw thread measurement
VDI/VDE/DGQ 2618 Sheet 10.2
Published Date: 04/01/2010
Inspection of measuring and test equipment - Test instruction for micrometers for screw thread measurement and other measurement purposes
VDI/VDE/DGQ 2618 Sheet 10.3
Published Date: 08/01/2002
Inspection of measuring and test equipment - Test instructions for micro meters with dial indicator