NR NR/L2/SIG/30097/APPH ISSUE 3 PDF

NR NR/L2/SIG/30097/APPH ISSUE 3 PDF

Name:
NR NR/L2/SIG/30097/APPH ISSUE 3 PDF

Published Date:
04/07/2014

Status:
[ Active ]

Description:

Modular Signalling: Appendix H: GRIP Stages 1 and 3 - Feasibility Assessment and Requirements Analysis

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This document should apply to any resignalling scheme that has been designated a "Modular Signalling scheme" by the Professional Head [S&T] Engineering and the Head of Operations Development. Such schemes will make use of Modular Signalling principles, technology and processes which are fundamentally different from those used for a conventional resignalling scheme undertaken by Network Rail.

Purpose

This guidance document sets out the documentation and activities that should be carried out the first two stages in the development process to deploy the Modular Signalling system on a route, together with early enabling works to help meet the target of a 24-month project duration. Although the document contains guidance, the process described is approved best practice.

There is no equivalent to GRIP Stage 2 as Modular Signalling is deployed on a like-for-like basis, without providing any enhancement to the existing railway. There are no technology choices to make. As a result, there are no options to identify for evaluation in later development stages.

Other sections of the Modular Signalling Handbook set out the technical standards, constraints, components and applications which form the Modular Signalling system. In particular, the main section of the Handbook defines the constraints within which the Modular Signalling system should be applied.

Exceedance of any of the constraints is possible but should be made in the understanding that to do so will incur a cost increase possibly disproportionate to the degree of exceedance. This is due to the standardised, templated and automated processes becoming unusable by the deviation from the normal scope of supply.

This document also sets out the documentation and activities which make up the next stage in the project development process – Requirements Analysis (GRIP 3) Once deployment of the Modular Signalling system has been approved, this stage provides initial demonstrations of the new signalling arrangements for consultation with stakeholders.

It also provides further information on the route to improve the cost and programme estimates.

Templated programmes have been prepared for the various GRIP Stages.


Edition : 3
File Size : 1 file , 260 KB
Number of Pages : 27
Published : 04/07/2014

History


Related products

NR NR/GN/ELP/00011 ISSUE 3
Published Date: 10/01/2005
Guidance Note for Uninterruptible Power Supply (UPS) Equipment
$18.6
NR BRS-SM 851/6
Published Date: 06/01/1986
Apparatus Case, Large & Small Door Stay Retainer for Side Panel Assembly
$5.7
NR NR/CIV/SD/4204 ISSUE A
Published Date: 03/07/2020
Ribbon Covered Footbridge Series 4200: Stair Canopy
$5.7
NR RT/E/WI/27111 ISSUE 2
Published Date: 05/01/2005
Work Instruction for Isolation & Earthing at Old Oak Common Feeder Station No 1 including Cables to North Pole Deport & Interconnector Cables to Old Oak Common Feeder Station No 2 & Acton Lane & their Isolators (aka NR/WI/ELP/27111)
$13.2

Best-Selling Products

NS-ISO/IEC/IEEE 12207:2017
Published Date: 10/01/2018
Systems and software engineering — Software life cycle processes
NS-ISO/IEC/IEEE 15026-4:2021
Published Date: 06/22/2021
Systems and software engineering - Systems and software assurance - Part 4: Assurance in the life cycle
NS-ISO/IEC/IEEE 15288:2015
Published Date: 11/01/2018
Systems and software engineering — System life cycle processes
NS-ISO/IEC/IEEE 15288:2023
Published Date: 05/30/2023
Systems and software engineering — System life cycle processes
NS-ISO/IEC/IEEE 16085:2021
Published Date: 02/05/2021
Systems and software engineering — Life cycle processes — Risk management
NS-ISO/IEC/IEEE 16326:2009
Published Date: 11/01/2018
Systems and software engineering - Life cycle processes - Project management