NR NR/L2/SIG/30097/APPH5 ISSUE 2 PDF

NR NR/L2/SIG/30097/APPH5 ISSUE 2 PDF

Name:
NR NR/L2/SIG/30097/APPH5 ISSUE 2 PDF

Published Date:
06/02/2012

Status:
[ Active ]

Description:

Modular Signalling: Appendix H5: Equipment and drawing identification

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-sig-30097-apph5-issue-2_2764377

Choose Document Language:
13.20 €
Need Help?
PDF ONLY

This document shall apply to any resignalling scheme that has been designated a ‘Modular Signalling scheme' by the Professional Head [S&T] Engineering and the Head of Operations Development. Such schemes will make use of Modular Signalling principles, technology and processes which are fundamentally different from those used for a conventional resignalling scheme undertaken by Network Rail.

Purpose

This document sets out the way in which the various components of a Modular Signalling scheme shall be identified. This ensures a consistent approach across all applications of Modular Signalling and avoids the need to change design templates, etc, which would create additional work and cost.

This document is sectioned in accordance with the project development and delivery stages. Each section sets out how the components introduced or created in that stage shall be identified.

The identification methods documented are generally taken from Signalling Principles Committee Paper 2005/012.

Numbering of design drawings which form part of the final records for the scheme shall be carried out as shown in section 5.3 so as to provide a simple, standardised way of numbering drawings, especially where many can be reused, almost unchanged, from site to site.

Version control shall be applied to drawings in accordance with the practice set out in NR/SP/SIG/11201.


Edition : 2
File Size : 1 file , 200 KB
Number of Pages : 13
Published : 06/02/2012

History


Related products

NR NR/L3/OCS/044/FS-27B ISSUE 1
Published Date: 06/04/2011
Managed Stations Manual: Project Review Group – Checklist for the Review of a Project Safety Case
5.70 €
NR NR/L3/MTC/RCS0216/SP16 ISSUE 3
Published Date: 03/03/2012
Risk Control Manual: Use of Site Lights
5.70 €
NR NR/L2/ELP/27009/MOD C51 ISSUE 1
Published Date: 12/03/2011
General Wire Creep Compensation Work. Contact Wires/Catenary
5.70 €
NR NR/L3/MTC/RCS0216/SIG04 ISSUE 2
Published Date: 03/03/2012
Risk Control Manual: Working on Train Protection Equipment
5.70 €

Best-Selling Products

AOAC METHODS
Published Date: 01/01/2002
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/2007
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/1990
AOAC OFFICIAL METHODS OF ANALYSIS
135.00 €
AOAC METHODS
Published Date: 01/01/1995
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/2006
AOAC OFFICIAL METHODS OF ANALYSIS
AOAC METHODS
Published Date: 01/01/1999
AOAC OFFICIAL METHODS OF ANALYSIS