NR NR/L2/SIG/30097/APPO ISSUE 2 PDF

NR NR/L2/SIG/30097/APPO ISSUE 2 PDF

Name:
NR NR/L2/SIG/30097/APPO ISSUE 2 PDF

Published Date:
06/02/2012

Status:
[ Active ]

Description:

Modular Signalling: Appendix O: Assurance

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

Purpose

This document forms a part of the Modular Signalling Handbook. It summarises the activities needed in order to demonstrate that the correct processes have been followed and that the project works can be brought into service safely.

Modular Signalling delivers cost savings by repeated application of the same products and processes. Following initial assurance of these products and processes, safety assurance for each scheme can be achieved by verifying that the application is made in accordance with the documented methods and limits. Where application is made outside of these limits a scheme specific assurance action will be needed.

The processes used by the suppliers of Modular Signalling systems for detailed design, testing and construction include the assurance activities they carry out to ensure their products meet the general and specific requirements of the project. This document indicates the assurance activities Network Rail need to carry out in order to support the project works through design, construction and into service.

Compliance through the project lifecycle is recorded on a checklist, shown at the end of this document. The project stages and the key assurance activities associated with that stage.


Edition : 2
File Size : 1 file , 130 KB
Number of Pages : 9
Published : 06/02/2012

History


Related products

NR NR/CIV/SD/2135-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 9.4m Internal Unit Right Skew 15°
$5.7
NR NR/L3/OCS/043/4.9 ISSUE 1
Published Date: 03/01/2008
National Control Instructions: Rolling Stock Management
$5.7
NR NR/L2/SIG/30009/E430 ISSUE 1
Published Date: 12/01/2007
Signalling Principles - Provision of Derailment Detectors
$7.5
NR BRS-SE 69/50 ISSUE F
Published Date: 07/17/1990
Cable Glands for Silec Treadles
$5.7

Best-Selling Products

DOXPUB 02-0001-SOP
Published Date: 08/01/2007
Recovery of Cryopreserved Cells
DOXPUB 02-0002-SOP
Published Date: 08/01/2007
Removal of Adherent Cells from Tissue Culture Flasks Using Trypsin/EDTA Solution
$4.2
DOXPUB 02-0003-SOP
Published Date: 08/01/2007
Assembly, Standardization, Sterilization and Inoculation of the Cell-Pharm Hollow Fiber Bioreactor for Antibody Production
$20.7
DOXPUB 02-0006-SOP-1.0
Published Date: 11/01/2004
Concentration of Bulk Antibody
$60
DOXPUB 02-0006-SOP
Published Date: 08/01/2007
Concentration of Bulk Antibody
$14.7
DOXPUB 02-0007-SOP
Published Date: 08/01/2007
Cell Culture Fluid Waste Disposal
$5.7