NR NR/L2/SIG/31000 ISSUE 1 PDF

NR NR/L2/SIG/31000 ISSUE 1 PDF

Name:
NR NR/L2/SIG/31000 ISSUE 1 PDF

Published Date:
12/05/2020

Status:
[ Active ]

Description:

Provision of Off-Grid Power Supply for Signalling and Level Crossings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This standard:

a) sets out the process for designing and implementing off-grid power supply systems for use at level crossings and other off-grid rail infrastructure;

b) covers the design requirements of off-grid DC power supplies at 24 volts, for a maximum mean continuous electrical load of 200 watts to be used at level crossings and other remote rail infrastructure locations.

It applies to all stakeholders involved in the design, procurement, installation, operation and maintenance of off-grid power supply systems.

Purpose

This standard describes the off-grid power supply system design process and requirements providing a standard level of functionality across Network Rail for level crossings and other remote rail infrastructure locations.


Edition : 1
File Size : 1 file , 1.2 MB
Number of Pages : 30
Published : 12/05/2020

History


Related products

NR T25000 ISSUE 4
Published Date: 06/05/2021
Lineside & on Track Equipment Typical Circuits - Points - Point Control/Drive & Detection: Overview Sheet (1) - RRI
$5.7
NR BRS-SM 696 ISSUE 1
Published Date: 05/01/1994
Train Operated Points General Arrangements
$5.7
NR SSI8505B ISSUE 6
Published Date: 09/05/2015
SSI Data Procedures - Chapter B: General Information
$7.5
NR BRS-SM 452/6
Published Date:
4" Centres Ground Frame Spring
$5.7

Best-Selling Products

Fiberboard Manufacturing Practices
Published Date: 02/01/1991
$19.5