NR NR/L2/SIGELP/27416 ISSUE 1 PDF

NR NR/L2/SIGELP/27416 ISSUE 1 PDF

Name:
NR NR/L2/SIGELP/27416 ISSUE 1 PDF

Published Date:
03/04/2017

Status:
[ Active ]

Description:

Alterations to Signalling Power Systems

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.3
Need Help?
PDF ONLY

System Boundary

The diagrams below illustrate the system boundary and associated sub-systems of typical SPSs to which this specification applies. Other electrical architectures of an SPS also exist (examples are shown in Appendix B) but the key sub system elements are generally the same.

Purpose

This standard defines the functional and electrical requirements to be applied when undertaking alterations to existing Signalling Power Systems (SPSs).


Edition : 1
File Size : 1 file , 1.1 MB
Number of Pages : 56
Published : 03/04/2017

History


Related products

NR BRS-SW 67-F21 ISSUE 3
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Train Operated Warning System Interlocking B Disengaging Relays (1)
$5.7
NR BRS-SM 5353/S1 ISSUE C
Published Date: 03/18/1987
Rail Clamp Point Lock Parts List for Multiple Drive HV Switches
$5.7
NR NR/CIV/SD/456 ISSUE A
Published Date: 03/07/2020
Non-Canopy Station Footbridges: CHS and Trestle Supports - Cabling Containment Fixing Details
$5.7
NR NR/L3/ELP/SAI25/01 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI): General Requirements
$13.2

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1