NR NR/L2/TEL/00028 ISSUE 3 PDF

NR NR/L2/TEL/00028 ISSUE 3 PDF

Name:
NR NR/L2/TEL/00028 ISSUE 3 PDF

Published Date:
09/07/2024

Status:
[ Active ]

Description:

Controlled Climate Trackside Housing for Telecommunications Equipment (formerly NR/PS/TEL/00028)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard provides the specification and requirements to be met for the design and construction of climate control housing for active telecommunications equipment and associated infrastructure.

This document applies to current and future Network Rail telecommunication scenarios, to establish the requirements that define size and capacity ranges of the climate control housing in accordance with the needs of the projects.

This document is not a design for a specific housing configuration or for any specific application. 

This document applies to anyone responsible for:

a) defining specific project requirements;

b) designing and selecting the housing configuration;

c) designing and selecting telecoms equipment for project application;

d) demonstrating that housing meets the requirements set out in the project design.

Purpose 

This standard defines the minimum requirements to be used when selecting controlled climate trackside housing for telecommunication equipment in a range of typical applications on the Network Rail infrastructure, supporting both operational railway and business services. 


Edition : 3
File Size : 1 file , 460 KB
Number of Pages : 31
Published : 09/07/2024

History

NR NR/L2/TEL/00028 ISSUE 3
Published Date: 09/07/2024
Controlled Climate Trackside Housing for Telecommunications Equipment (formerly NR/PS/TEL/00028)
$13.2
NR NR/PS/TEL/00028 ISSUE 2
Published Date: 04/01/2006
Controlled Climate Trackside Housing for Telecommunications Equipment - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2

Related products

NR NR/L2/SIG/11201/MOD X99 ISSUE 1
Published Date: 09/03/2011
Signalling Design Handbook: Level Crossings - History of Level Crossings
$13.2
NR BRS-SM 2492
Published Date: 09/07/1995
HW & 63 Electric Point Machines Lock Rod Assembly Switch Diamonds
$5.7
NR NR/L2/ELP/27009/MOD C87 ISSUE 1
Published Date: 03/04/2017
Overhead Line Equipment Campaign Changes: Replace Worn Stainless Steel Bridles
$5.7
NR BRS-SE 12
Published Date: 10/21/1958
Fuseholder - Porcelain for BS 714 Cartridge Fuse
$5.7

Best-Selling Products