NR NR/L2/TEL/30182 ISSUE 1 PDF

NR NR/L2/TEL/30182 ISSUE 1 PDF

Name:
NR NR/L2/TEL/30182 ISSUE 1 PDF

Published Date:
03/04/2017

Status:
[ Revised ]

Description:

Specification for Secure Configuration and Management of Network Rail Telecom Internet Protocol (IP) Networks, Systems and Devices - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This standard specifies the minimum security requirements for configuring, managing and monitoring the Network Rail Telecom IP network, network devices and connected systems.

This standard applies to all Network Rail staff and contractors responsible for designing, building, configuring and maintaining Network Rail Telecom IP networks and connected systems.

Purpose

The purpose of this standard is to specify the application of security controls required to protect Network Rail Telecom Internet Protocol (IP) networks in order to manage security risks to IP networks, network devices and connected systems throughout their operational lifecycle


Edition : 1
File Size : 1 file , 470 KB
Number of Pages : 18
Published : 03/04/2017

History

NR NR/L2/TEL/30182 ISSUE 2
Published Date: 03/02/2019
Secure Configuration and Management of Network Rail Telecom Internet Protocol (IP) Networks, Systems and Devices
$13.2
NR NR/L2/TEL/30182 ISSUE 1
Published Date: 03/04/2017
Specification for Secure Configuration and Management of Network Rail Telecom Internet Protocol (IP) Networks, Systems and Devices - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$13.2

Related products

NR NR/L3/OCS/044/MS-06 ISSUE 2
Published Date: 06/04/2011
Managed Station Manual: Safety Brief for Contractors/Visitors
$5.7
NR NR/L3/OPS/045/2.05 ISSUE 2
Published Date: 06/02/2018
National Operating Procedure (NOP) 2.05: Train Dispatch Competence - Assessment Process
$18.6
NR NR/L2/TRK/001/MOD12 ISSUE 8
Published Date: 09/07/2019
Inspection and Maintenance of Permanent Way: Track Geometry - Maintenance Design Requirements
$13.2
NR NR/L2/ELP/27009/MOD C40 ISSUE 1
Published Date: 12/03/2011
REPLACEMENT OF 'PEA SHOOTER' TYPE BI METAL CONNECTIONS TO AWAC CATENARY
$5.7

Best-Selling Products

Materials & Processes
Published Date: 09/01/1998
$6