NR NR/L2/TEL/31001 ISSUE 4 PDF

NR NR/L2/TEL/31001 ISSUE 4 PDF

Name:
NR NR/L2/TEL/31001 ISSUE 4 PDF

Published Date:
03/03/2018

Status:
[ Active ]

Description:

Telecom Maintenance Testing & Fault Investigation Process

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$35.4
Need Help?
PDF ONLY

The TMT&FIP applies to testing work on all equipment and systems that are carrying operational telecommunications traffic. This includes bearer circuits carried over Network Rail owned infrastructure.

This standard does not apply to train borne equipment where maintained by non- Network Rail staff or product acceptance testing. Health and Safety requirements are not included in this standard.

Purpose

The purpose of the Telecom Maintenance Testing & Fault Investigation Process (TMT&FIP) is to manage and minimise risks associated with Moving Train and/or Loss of /miscommunication of voice and data transmission for Safety and Operational Critical Services (e.g. Solid State Interlocking, Axle Counters, Supervisory control and data acquisition) by making sure the fundamental causes of safety related telecommunications failures are identified and through maintenance testing, equipment is returned to service in a safe and controlled manner and that any replacements are working correctly.


Edition : 4
File Size : 1 file , 1.3 MB
Number of Pages : 159
Published : 03/03/2018

History


Related products

NR E10000/161/11 ISSUE A
Published Date: 11/01/1993
W.R. Control Table - Route Counter Condition
$5.7
NR BRS-SM 2320 ISSUE F
Published Date: 02/08/1996
Electric Point Machine Fittings General Electric Arrangement for Plain Leads on Timber113A Stock & UIC-54B Switch Rail
$5.7
NR NR/L3/CIV/006 ISSUE 12
Published Date: 06/01/2024
Structures, Tunnels and Operational Property Examinations
$18.6
NR BRS-SM 381/2 ISSUE A
Published Date: 05/30/1974
Asbestos Cement Cable Troughing Run Lid Clamp
$5.7

Best-Selling Products

NATO AACP-02.1
Published Date: 07/09/2019
COUNTRY POINTS OF CONTACT
NATO AACP-02
Published Date: 07/09/2019
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS
NATO AACP-1
Published Date: 01/01/1989
GUIDANCE FOR THE DRAFTING OF MOUS AND PROGRAMME MOUS - BASIC CONSIDERATIONS CHECKLIST
NATO AACP-2 VOL 10
Published Date: 02/14/2012
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS - VOLUME 10
NATO AACP-2 VOL 1
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR FEASIBILITY STUDY WORK - VOLUME 1
NATO AACP-2 VOL 2
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR PROJECT DEFINITION AND DESIGN AND DEVELOPMENT - VOLUME 2