NR NR/L2/TRK/001/MOD11 ISSUE 9 PDF

NR NR/L2/TRK/001/MOD11 ISSUE 9 PDF

Name:
NR NR/L2/TRK/001/MOD11 ISSUE 9 PDF

Published Date:
06/05/2021

Status:
[ Revised ]

Description:

Inspection and Maintenance of Permanent Way: Track Geometry: Inspection and Minimum Actions

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-trk-001-mod11-issue-9_2772906

Choose Document Language:
18.60 €
Need Help?
PDF ONLY

This module of NR/L2/TRK/001 specifies, in relation to track geometry:

a) track geometry inspection;

b) track geometry measurement requirements;

c) action and associated timescales for the rectification of geometry faults;

d) the inspection and control measures required for sections of track for which recorded track geometry is worse than ‘poor’;

e) the requirements for managing dip angles;

f) retention of records.


Edition : 9
File Size : 1 file , 610 KB
Number of Pages : 27
Published : 06/05/2021

History

NR NR/L2/TRK/001/MOD11 ISSUE 11
Published Date: 03/05/2022
Inspection and Maintenance of Permanent Way: Track Geometry - Inspections and Minimum Actions
18.60 €
NR NR/L2/TRK/001/MOD11 ISSUE 10
Published Date: 09/04/2021
Inspection and Maintenance of Permanent Way: Track Geometry - Inspections and Minimum Actions
18.60 €
NR NR/L2/TRK/001/MOD11 ISSUE 9
Published Date: 06/05/2021
Inspection and Maintenance of Permanent Way: Track Geometry: Inspection and Minimum Actions
18.60 €
NR NR/L2/TRK/001/MOD11 ISSUE 8
Published Date: 09/05/2015
Inspection & Maintenance of Permanent Way: Track Geometry - Inspections and Minimum Actions
18.60 €

Related products

NR SSI8003-102B ISSUE 1
Published Date: 12/01/2002
SSI Data Preparation - Core Data for Level Crossings - Bi-Directional Track - One Signal - Chapter B: Crossing Input TFM (aka RT/SSI/8003-102B)
18.60 €
NR SMF/SE/0468X ISSUE 1
Published Date: 09/01/2011
Record of On Site Surveillance - Contractors Work Group
5.70 €
NR NR/SIN/116 ISSUE 3
Published Date: 07/16/2013
Design Deficiency Rectification - Automatic Half Barrier, Miniature Stop Light and Miniature Warning Light Crossings
7.50 €
NR E10129/10 ISSUE 1
Published Date: 09/01/2004
Typical Circuits Former Western Region Ground Frame Controls (Mechanically Operated) Inside Interlocking Areas (Route Setting) NX Panels
5.70 €

Best-Selling Products

ISA 100.11A
Published Date: 05/04/2011
Wireless systems for industrial automation: Process control and related applications
95.70 €
ISA 100.11A
Published Date: 01/01/2009
Wireless systems for industrial automation: Process control and related applications
178.80 €
ISA 101.01
Published Date: 07/09/2015
Human Machine Interfaces for Process Automation Systems
78.30 €
ISA 106.00.01
Published Date: 06/15/2023
Procedure Automation for Continuous Process Operations
98.10 €
ISA 107.1
Published Date: 01/29/2013
Industry Standard File Format for Revolution-Based Tip Timing Data
21.90 €
ISA 12.00.01
Published Date: 07/15/1999
Electrical Apparatus for Use in Class I, Zones 0, 1, & 2 Hazardous (Classified) Locations - General Requirements
20.70 €