NR NR/L2/TRK/001/MOD18 ISSUE 7 PDF

NR NR/L2/TRK/001/MOD18 ISSUE 7 PDF

Name:
NR NR/L2/TRK/001/MOD18 ISSUE 7 PDF

Published Date:
09/04/2021

Status:
[ Active ]

Description:

Inspection and Maintenance of Permanent Way: Buffer Stops and Train Arresting Devices Inspection, Maintenance and Risk Assessment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module of NR/L2/TRK/001 and the associated TEF 3028 applies to: 

a) Fixed buffer stops; 

b) Sliding/friction buffer stops; 

c) Hydraulic buffer stops; 

d) Combined friction/hydraulic buffer stop; 

e) Sand drags; and 

f) Those who assess the risk from rail vehicles overrunning a buffer stop. 

Note: Design and Installation requirements are incorporated within NR/L2/TRK/2102 Design and Construction of Track.

Purpose of a Buffer Stop 

The purpose of a buffer stop is:

a) to identify the “Limit of Movement Authority” to the driver of a rail vehicle.

b) to dissipate energy and arrest the movement of a rail vehicle which passes the Limit of Movement Authority;

c) to protect passengers and train crew in the event of an overrun of a terminal line;

d) protect staff, members of the public, and structures within the buffer stop Overrun Risk Zone from the effect of an overrun of a terminal line; and

e) protect trains on adjacent running lines in the event of an overrun of a terminal line. 

  


Edition : 7
File Size : 1 file , 360 KB
Number of Pages : 12
Published : 09/04/2021

History

NR NR/L2/TRK/001/MOD18 ISSUE 7
Published Date: 09/04/2021
Inspection and Maintenance of Permanent Way: Buffer Stops and Train Arresting Devices Inspection, Maintenance and Risk Assessment
$13.2
NR NR/L2/TRK/001/MOD18 ISSUE 6
Published Date: 12/01/2012
Inspection & Maintenance of Permanent Way: Buffer Stops
$5.7

Related products

NR NR/L3/ELP/27240/NR/DIST C22P ISSUE 2
Published Date: 03/01/2017
Routine Maintenance of ABB. 11kV and 22kV SF6 Circuit Breakers Type "SAFESIX" and Associated Equipment within the Circuit Breaker Cubicle
$5.7
NR NR/CIV/SD/1471 ISSUE C
Published Date: 12/03/2016
D-Type Underbridges: Concrete & Reinforcement Details: Reinforcement Details 0 to 25 Degrees Composite Floor
$5.7
NR NR/EPF/OLE/025 ISSUE 1
Published Date: 05/09/2018
Document Master Out Request Form (MORF)
$5.7
NR NR/CIV/SD/660 ISSUE C
Published Date: 03/01/2019
Paint Details for Concrete Encased Metallic Elements & Patch Repairs to Existing Metallic Structures
$5.7

Best-Selling Products