NR NR/L2/TRK/038/02 ISSUE 1 PDF

NR NR/L2/TRK/038/02 ISSUE 1 PDF

Name:
NR NR/L2/TRK/038/02 ISSUE 1 PDF

Published Date:
06/02/2018

Status:
[ Active ]

Description:

Track Geometry: Management of Recording and of Intervention and Immediate Actions Limits: Manual Track Geometry Recording

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

This supporting module defines the process for detection of Intervention Limit (IL) and Immediate Action Limit (IAL) faults using manual track geometry measuring equipment to manage the risk to derailment on lines not recorded by train borne recording vehicles.

It is applicable to manual track geometry measurement devices and manual track geometry measurement recorders that record unloaded track geometry.

It does not apply to larger recording trolleys used to verify Enhanced Permissible Speed (EPS) geometry, or to manual/automatic trolleys primarily designed to act as the target for total stations or theodolites


Edition : 1
File Size : 1 file , 230 KB
Number of Pages : 9
Published : 06/02/2018

History


Related products

NR NR/CIV/SD/323 ISSUE E
Published Date: 09/02/2017
Earthwork Drains: Crest Drain Outfall
$5.7
NR SSI8503 ISSUE 4
Published Date: 03/01/2011
SSI Applications Manual - Earthing and Bonding of Solid State Interlocking Equipment
$18.6
NR BRS-SM 123/3
Published Date: 01/05/1957
Eye End for Signal Wire Adjuster
$5.7
NR NR/L3/SIG/11303/2G05 ISSUE 5
Published Date: 12/03/2016
Signalling Installation: Locations: Construction
$13.2

Best-Selling Products