NR NR/L2/TRK/053 ISSUE 9 PDF

NR NR/L2/TRK/053 ISSUE 9 PDF

Name:
NR NR/L2/TRK/053 ISSUE 9 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Inspection and Repair to Control the Risk of Derailment at Switches

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
CONTAINS NR/BS/LI/441

This standard applies to the inspection and maintenance of switches on running lines and sidings. This applies to all types of switch machining in both bullhead and flatbottom rail sections.

The scope of the standard excludes:

a) the derailing switch of trap and catch points;

b) switch diamonds; and

c) adjustment switches.

Purpose

This standard details the inspection regime, monitoring procedures, immediate actions and essential maintenance to be undertaken at switches to control the risk of derailment, maximise asset life and deliver good operational availability.

This document provides a process to mitigate the risks associated with NR/GN/TRK/8001/0601 (Switches and Crossing: Failure to provide correct guidance of train wheels).


Edition : 9
File Size : 1 file , 630 KB
Number of Pages : 17
Published : 03/07/2020

History

NR NR/L2/TRK/053 ISSUE 10
Published Date: 12/03/2022
Inspection and Repair to Control the Risk of Derailment at Switches
$13.2
NR NR/L2/TRK/053 ISSUE 9
Published Date: 03/07/2020
Inspection and Repair to Control the Risk of Derailment at Switches
$13.2

Related products

NR NR/L2/SIG/30014/B310 ISSUE 3
Published Date: 06/02/2012
Signalling Works Testing Training and Competence Modules - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6
NR NR/L3/CIV/140/112N ISSUE 2
Published Date: 12/01/2008
Model Clause 112N: Loose-Laid Systems for Underline Bridges
$5.7
NR NR/WI/TRK/03401 ISSUE 2
Published Date: 02/01/2007
Welding Process - Use of Welding Tents
$13.2
NR NB 078 ISSUE 1
Published Date: 09/01/2007
Testing following Cable Replacement
$5.7

Best-Selling Products