NR NR/L2/TRK/053/MOD03 ISSUE 4 PDF

NR NR/L2/TRK/053/MOD03 ISSUE 4 PDF

Name:
NR NR/L2/TRK/053/MOD03 ISSUE 4 PDF

Published Date:
12/03/2022

Status:
[ Active ]

Description:

Inspection and Repair to Control the Risk of Derailment at Switches: Module 3: Repair of Switches

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module of NR/L2/TRK/053 covers: 

a) the process for determining the repair of switch and stock rails where a detailed inspection has identified that immediate or remedial action is required; 

b) welding and grinding requirements in relation to remedial action; 

c) checks carried out both during and on completion of the remedial works; and 

d) lubrication following repair. 


Edition : 4
File Size : 1 file , 360 KB
Number of Pages : 12
Published : 12/03/2022

History

NR NR/L2/TRK/053/MOD03 ISSUE 4
Published Date: 12/03/2022
Inspection and Repair to Control the Risk of Derailment at Switches: Module 3: Repair of Switches
$13.2
NR NR/L2/TRK/053/MOD03 ISSUE 3
Published Date: 09/07/2019
Inspection and Repair to Control the Risk of Derailment at Switches: Module 3: Repair of Switches
$13.2

Related products

NR NR/L2/SIG/30014/D120/TS8-25 ISSUE 1
Published Date: 12/01/2012
Signalling Works Testing: ATP Loop (Chilterns) Test Specification
$5.7
NR NR/L3/ELP/22001/01 ISSUE 1
Published Date: 06/04/2022
Procedure for Persons Working Near High Voltage Cables and Cable Routes in Southern Region Only
$13.2
NR BRS-SM 2222/1 ISSUE D
Published Date: 10/14/1991
Rail Clamp Point Lock MK2 Lock Arm Type B6
$5.7
NR NR/L3/ELP/SAI25/02 ISSUE 2
Published Date: 12/02/2023
Working On or About Overhead Line Equipment (SAI): Assessment and Management of Electrical Risk
$24.3

Best-Selling Products

UNE-CEN ISO/TS 11133-1:2009
Published Date: 09/16/2009
Microbiology of food and animal feeding stuffs - Guidelines on preparation and production of culture media - Part 1: General guidelines on quality assurance for the preparation of culture media in the laboratory (ISO/TS 11133-1:2009)
UNE-CEN ISO/TS 11133-2:2006
Published Date: 05/10/2006
Microbiology of food and animal feeding stuffs - Guidelines on preparation and production of culture media - Part 2: Practical guidelines on performance testing of culture media (ISO/TS 11133-2:2003)
UNE-CEN ISO/TS 11135-2:2009 EX
Published Date: 09/02/2009
Sterilization of health care products - Ethylene oxide - Part 2: Guidance on the application of ISO 11135-1 (ISO/TS 11135-2:2008)
UNE-CEN ISO/TS 15874-7:2005
Published Date: 01/12/2005
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 7: Guidance for the assessment of conformity (ISO/TS 15874-7:2003)
UNE-CEN ISO/TS 15875-7:2005
Published Date: 01/12/2005
Plastics piping systems for hot and cold water installations - Crosslinked polyethylene (PE-X) - Part 7: Guidance for the assessment of conformity (ISO/TS 15875-7:2003)
UNE-CEN ISO/TS 15876-7:2005
Published Date: 01/12/2005
Plastics piping systems for hot and cold water installations - Polybutylene (PB) - Part 7: Guidance for the assessment of conformity (ISO/TS 15876-7:2003)