NR NR/L2/TRK/2500 ISSUE 4 PDF

NR NR/L2/TRK/2500 ISSUE 4 PDF

Name:
NR NR/L2/TRK/2500 ISSUE 4 PDF

Published Date:
12/05/2020

Status:
[ Active ]

Description:

Engineering Assurance Arrangements for the Design and Construction of Track

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-trk-2500-issue-4_2760316

Choose Document Language:
18.60 €
Need Help?
PDF ONLY

This procedure applies to:

a) the Track engineering content of all projects proposed to be implemented for which Network Rail is the Infrastructure Manager including feasibility studies,concept, Approval in Principle (Form  A) and detailed (Form B) designs, construction, entry into service and completion; and

b) proposals for temporary works (including stage-works) associated with such projects.

These procedures do not apply to:

c) normal Day to Day Maintenance work that is not included within the requirements of a Cat M check as per Appendix B; and

d) work carried out under emergency conditions.

The requirements of this standard are complementary to those contained within NR/L2/INI/02009 in which the general engineering assurance requirements for projects are contained. This standard does not replace any content within NR/L2/INI/02009.

Assurance arrangements for considerations related to Technical Specifications for Interoperability (TSIs) are not covered by this standard.

Assurance of drainage designs – including where required by this standard to be shown in conjunction with track designs – is governed by NR/L2/CIV/003.

Purpose

This document describes the engineering assurance processes that apply to the design and construction of track assets on Network Rail owned infrastructure so that they operate as intended.

 


Edition : 4
File Size : 1 file , 680 KB
Number of Pages : 31
Published : 12/05/2020

History

NR NR/L2/TRK/2500 ISSUE 4
Published Date: 12/05/2020
Engineering Assurance Arrangements for the Design and Construction of Track
18.60 €
NR NR/L2/TRK/2500 ISSUE 3
Published Date: 06/04/2011
Engineering Assurance Arrangements for Track Engineering Projects
13.20 €

Related products

NR X31010 ISSUE 2
Published Date: 02/05/2000
AOCL Typical Circuits Layout Single Line
5.70 €
NR BRS-SW 67-17 ISSUE 8
Published Date: 12/04/2004
Typical Free Wired Interlocking Circuits - Route Releasing on Shunt Signals
5.70 €
NR NR/CIV/SD/FORMB/560 ISSUE B02
Published Date: 06/01/2010
Form B: Certificate of Design & Checking for Standard Tunnel Details Shaft Liner Plates
13.20 €
NR T25717 ISSUE 2
Published Date: 03/06/2010
Lineside & on Track Typical Circuits Points - Hy-Drive - SSI - Double End - Indirect Drive Location Interface and Combined Detection Circuits Non-Preferred Option
5.70 €

Best-Selling Products

PCA DX074D
Published Date:
High Strength Bars as Concrete Reinforcement, Part 6. Fatigue Tests
PCA DX093D
Published Date:
Fatigue Tests of Reinforcing Bars
PCA DX139P
Published Date:
Influence of Aggregate Properties on Effectiveness of Interlock Joints in Concrete Pavements
PCA DX145D
Published Date:
Fatigue Tests of Reinforcing Bars-Effect of Deformation Pattern
PCA EB001.15
Published Date: 2011
Design and Control of Concrete Mixtures, 15th edition
PCA EB001.16
Published Date: 2016
Design and Control of Concrete Mixtures, 16th edition