NR NR/L2/TRK/6100/MOD06 ISSUE 1 PDF

NR NR/L2/TRK/6100/MOD06 ISSUE 1 PDF

Name:
NR NR/L2/TRK/6100/MOD06 ISSUE 1 PDF

Published Date:
03/07/2015

Status:
[ Revised ]

Description:

The Installation and Maintenance of Stretcher Bars: 35mm Adjustable Stretcher Bars - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE FOR NEW DESIGN * PDF ONLY

This module applies to 35mm adjustable stretcher bar assemblies, their associated fastenings and defects on all S&C point switches fitted with 35mm square section adjustable stretcher bars on the following rail sections:

• CEN56 (BS113A) full depth switches

• RT60 shallow depth switches

• CEN54 (UIC54B) shallow depth switches

• Plain leads and switch diamonds in running lines.

Purpose

This module contains information to support the installation and maintenance of 35mm adjustable stretcher bars.


Edition : 1
File Size : 1 file , 2.3 MB
Number of Pages : 45
Published : 03/07/2015

History

NR NR/L2/TRK/6100/MOD06 ISSUE 3
Published Date: 06/03/2023
The Installation and Maintenance of Stretcher Bars: 35mm Adjustable Stretcher Bars
$18.6
NR NR/L2/TRK/6100/MOD06 ISSUE 2
Published Date: 12/05/2020
The Installation and Maintenance of Stretcher Bars: 35mm Adjustable Stretcher Bars
$18.6
NR NR/L2/TRK/6100/MOD06 ISSUE 1
Published Date: 03/07/2015
The Installation and Maintenance of Stretcher Bars: 35mm Adjustable Stretcher Bars - This standard should only be used for reference to ensure 'The Control of Risk' until the compliance date of its replacement standard is reached, upon which this standard will be withdrawn. The development of all new processes and procedures should be to the replacement standard
$18.6

Related products

NR TWI 3T005 ISSUE 1
Published Date: 03/01/2005
How to Define Alignment Schemes
$5.7
NR E10000/7/11 ISSUE A
Published Date: 03/01/1993
Signal Control Circuits - Double Compound Indications WR Ind on HW (WR) Panels Historical
$7.5
NR NR/FP C100 ISSUE 5
Published Date: 09/04/2021
Fixed Plant Work Instructions: Functional Supply Points (FSPs)
$5.7
NR NR/CIV/SD/2226-2 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details Capping Slab for 7.4m Span Right Skew 45° Horizontal Deck
$5.7

Best-Selling Products