NR NR/L2/TRK/6100/MOD08 ISSUE 2 PDF

NR NR/L2/TRK/6100/MOD08 ISSUE 2 PDF

Name:
NR NR/L2/TRK/6100/MOD08 ISSUE 2 PDF

Published Date:
06/03/2017

Status:
[ Revised ]

Description:

The Installation and Maintenance of Stretcher Bars: Action Tables

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This module applies to technicians that are responsible for the inspection, maintenance and installation of fixed, 35mm adjustable and tubular stretcher bars

Purpose

Stretcher bar assemblies are installed so that switches and crossings can provide correct guidance to train wheels. This module specifies the correct minimum actions to be taken on discovery of a defect on fixed, 35mm adjustable and tubular stretcher bar assemblies


Edition : 2
File Size : 1 file , 850 KB
Number of Pages : 36
Published : 06/03/2017

History

NR NR/L2/TRK/6100/MOD08 ISSUE 4
Published Date: 06/03/2023
The Installation and Maintenance of Stretcher Bars: Action Tables
$18.6
NR NR/L2/TRK/6100/MOD08 ISSUE 3
Published Date: 12/05/2020
The Installation and Maintenance of Stretcher Bars: Action Tables
$18.6
NR NR/L2/TRK/6100/MOD08 ISSUE 2
Published Date: 06/03/2017
The Installation and Maintenance of Stretcher Bars: Action Tables
$18.6

Related products

NR NR/CIV/SD/1404 ISSUE E
Published Date: 09/02/2017
D-Type Underbridges: General Notes and H&S Risk Register
$5.7
NR BRS-SM 2216
Published Date: 04/28/1986
Rail Clamp Point Lock Adaptor Block Assy for FB Vertical Track
$5.7
NR SMF/MG/475 ISSUE 2
Published Date: 06/01/2015
Rail Testing & Friction Management Activity Management Self Assurance Form
$5.7
NR NR/L2/SIG/14201 ISSUE 5
Published Date: 12/05/2020
Signalling Risk Assessment Handbook
$7.5

Best-Selling Products