NR NR/L2/TRK/9017 ISSUE 2 PDF

NR NR/L2/TRK/9017 ISSUE 2 PDF

Name:
NR NR/L2/TRK/9017 ISSUE 2 PDF

Published Date:
08/26/2008

Status:
[ Inactive ]

Description:

CEN60E1 Rail: Components & Processes

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE * PDF ONLY

This specification applies to the procurement, installation, acceptance and maintenance of new and modified track where CEN60E1 rail or RT60 switches & crossings are specified.

It should be noted that this is a "living" document and that it will be updated as further developments take place. In some cases interim procedures and instructions are set out. In due course these will be formalised into Network Rail Company specifications, where this has not already been done.

PURPOSE

This specification provides guidance to all persons involved in the procurement, installation, acceptance and maintenance of new and modified track where CEN60E1 rail or RT60 switches & crossings are specified. The basic differences between CEN60E1 and BS113A rail and the differences between vertical and RT60 turnouts are described. The "special" requirements for components, equipment and procedures are summarised.


Edition : 2
File Size : 1 file , 600 KB
Number of Pages : 23
Published : 08/26/2008

History


Related products

NR BRS-ST 82/12
Published Date:
Link, Contact Box Lifting Barrier (Auto) MK II B
$5.7
NR X31110
Published Date: 02/04/1995
AOCL STANDARDS C/D RAIL SIGNAL CIRCUITS DOUBLE LINE BI-DIRECTIONAL
$5.7
NR NR/CIV/SD/FORM1/4400 ISSUE 3
Published Date: 03/05/2021
Frame Covered Footbridge Series 4400: Form 001
$13.2
NR NR/L3/CIV/140/216C ISSUE 1
Published Date: 05/01/1997
Model Clause 216C: Permanent Way Materials
$5.7

Best-Selling Products