NR NR/L2/XNG/202 ISSUE 1 PDF

NR NR/L2/XNG/202 ISSUE 1 PDF

Name:
NR NR/L2/XNG/202 ISSUE 1 PDF

Published Date:
09/04/2021

Status:
[ Revised ]

Description:

Prioritisation of Level Crossing Defects

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
INACTIVE FOR NEW DESIGN * PDF ONLY

This business process sets requirements for prioritising level crossing defects that are identified during the inspection process specified in NR/L2/XNG/19608.

It applies to all engineering maintenance personnel and level crossing managers.

Defects which are within the level crossing boundary but are not part ofthe level crossing system are out of scope.

Purpose

This business process enables consistent defect prioritisation which is aligned to the risk of the defect.


Edition : 1
File Size : 1 file , 510 KB
Number of Pages : 21
Published : 09/04/2021

History


Related products

NR AWS 4
Published Date:
ATC (AWS) Receiver Junction Box
$5.7
NR NR/L3/SIGELP/50001/SPS T002 ISSUE 2
Published Date: 12/03/2016
Signalling Power Distribution Equipment above 175 V (Work Instructions): Cable Insulation Resistance Test
$5.7
NR TWI 2S074 ISSUE 1
Published Date: 03/01/2005
How to Replace an S&C Check Chair
$5.7
NR NR/CIV/SD/F003/1000/ADD2 ISSUE B
Published Date: 12/01/2018
Box Girder Underbridges F003 Addendum
$24.3

Best-Selling Products

AA 23
Published Date: 01/01/2002
Welding Aluminum: Theory and Practice, Fourth Edition, 2002
$27
AA 23
Published Date: 01/01/2002
Draft -- Welding Aluminum: Theory and Practice
AA AACP
Published Date: 01/01/2004
Aluminum Alloy Castings: Properties, Processes, and Applications, 2004
AA ADM-1
Published Date: 01/01/2005
Aluminum Design Manual, 2005
AA ADM-1
Published Date: 2010
Aluminum Design Manual, 2010 Edition
AA ADM-2020
Published Date: 2020
Aluminum Design Manual, 2020 Edition
$148.5