NR NR/L2/XNG/30020/G22 ISSUE 1 PDF

NR NR/L2/XNG/30020/G22 ISSUE 1 PDF

Name:
NR NR/L2/XNG/30020/G22 ISSUE 1 PDF

Published Date:
06/01/2019

Status:
[ Active ]

Description:

Level Crossing Design Handbook - Module G22: Efficient Delivery Guidance for Overlay Miniature Stop Light Level Crossings

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This document describes an efficient delivery process for the implementation of OMSL level crossings. 

Purpose

This module describes the recommended processes to reduce the cost of implementation of Overlay Miniature Stop Light (OMSL) level crossings to an affordable level without compromising safety. Signalling design processes are followed as set out in NR/L2/SIG/11201 and this document informs how to comply in an efficient manner. The decision as to whether to use the processes contained within this document lies with the Route Asset Manager (Signalling) (RAM(S)), who may choose to use the full conventional implementation processes due to the complexities of the site. 

The processes described in this document show how ‘efficient delivery’ of OMSLs can be achieved with the RAM(S) taking the lead (and the Construction Design Management (CDM) Principle Designer role). If the level crossing being considered for OMSL installation is part of a larger scheme being undertaken by NR Infrastructure Projects (IP) (or others), then some or all of the duties shown in this document as being carried out by the RAM(S) could be undertaken instead by the NR project team with the Client’s agreement.


Edition : 1
File Size : 1 file , 710 KB
Number of Pages : 27
Published : 06/01/2019

History


Related products

NR RT/ETE/7/A/3
Published Date: 03/17/1998
Arrangement of Timber Track Cable Protective Trunking (Dual Way)
$5.7
NR TWI 3C003 ISSUE 1
Published Date: 03/01/2005
How to Specify and Order Baseplates
$5.7
NR NR/L3/OPS/0064 ISSUE 6
Published Date: 06/05/2021
Delivering Work within Possessions (aka NR/L3/INI/CP0064)
$18.6
NR NR/L2/RMVP/0200 ISSUE 14
Published Date: 09/07/2024
Infrastructure Plant Manual
$18.6

Best-Selling Products