NR NR/L3/CIV/006/4A ISSUE 2 PDF

NR NR/L3/CIV/006/4A ISSUE 2 PDF

Name:
NR NR/L3/CIV/006/4A ISSUE 2 PDF

Published Date:
09/07/2019

Status:
[ Active ]

Description:

Structures, Tunnels and Operational Property Examinations: Examination of Tunnels

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-civ-006-4a-issue-2_2761807

Choose Document Language:
18.60 €
Need Help?
PDF ONLY

This module applies to the examination of Network Rail owned, managed, shared and outside party Tunnels and their components.

This includes the examination of cut and cover Tunnels, unless stated in the Tunnel Management Strategy that the Structure, or part of it, is to be examined as a Bridge, in accordance with module NR/L3/CIV/006/1A.

This module is applicable to lined and unlined Tunnels, including Bores, Portals, Cross Passages, Adits and Shafts.

Purpose

This module has been produced to mitigate the risk that Tunnel specific risks are not picked up as part of the examination process leading to the failure of the asset.

This module contains requirements specific to the examination of Tunnels. It should be used in conjunction with the NR/L3/CIV/006/1A and NR/L3/CIV/006/1B.


Edition : 2
File Size : 1 file , 300 KB
Number of Pages : 22
Published : 09/07/2019

History


Related products

NR NR/L3/SIG/11303/2P45 ISSUE 2
Published Date: 09/04/2010
Signalling Installation Track Circuits: Reed (Jointed) Types
7.50 €
NR SMF/EP/0245 ISSUE 10
Published Date: 10/01/2010
Work On or Adjacent to Conductor Rail: Risk Level Ratings for Ellipse Standard Jobs
5.70 €
NR NR/CIV/SD/2141-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 7.4m External Unit Square Span
5.70 €
NR NR/L3/TEL/40047 ISSUE 5
Published Date: 12/04/2021
Process for the Management of Safety Related Reports for Telecoms Failures
18.60 €

Best-Selling Products

CAGI 2528
Published Date: 01/01/2009
CAGI B186.1, Safety Code for Portable Air Tools
49.50 €
CAGI 2534
Published Date:
Performance Under Pressure
CAGI 2535
Published Date:
Compressed Air
CAGI 2540
Published Date:
Principles of Air Compression
CAGI 2545
Published Date: 01/01/2002
Air Compressor Selection and Application: 1/4 HP Through 30 HP
CAGI 2546
Published Date: 01/01/1997
Rotary Air Compressor Selection Guide