NR NR/L3/CIV/140/125N ISSUE 3 PDF

NR NR/L3/CIV/140/125N ISSUE 3 PDF

Name:
NR NR/L3/CIV/140/125N ISSUE 3 PDF

Published Date:
06/01/2008

Status:
[ Active ]

Description:

Model Clause 125N: Bridge Installation by Thrust Boring

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.5
Need Help?
PDF ONLY

General

The installation of tunnels, bridges, culverts and the like by thrust boring techniques is a relatively new and developing technology. Usage in the UK has been mainly in deep cover systems where structures have been installed through high embankments.

In Europe, usage has included shallow cover systems – this has been prompted by the need to replace level crossings with underline bridges. There appears to have been little use for forming openings through high embankments.

Thrust boring must be carried out by specialist subcontractors.


Edition : 3
File Size : 1 file , 200 KB
Number of Pages : 8
Published : 06/01/2008

History


Related products

NR NR/L3/MTC/ME0201/CAL231 ISSUE 1
Published Date: 06/07/2008
Calibration Of Robin Digital RCD Tester
$5.7
NR BR 1911 ISSUE A
Published Date: 01/01/1991
Solid State Interlocking Processor Memory Module MkII
$13.2
NR NR/L3/CIV/006/3A ISSUE 4
Published Date: 09/03/2022
Structures, Tunnels and Operational Property Examinations: Examination of Operational Property Structures and Fabric
$18.6
NR BRS-ST 110/2
Published Date:
Stantion St Andrew's Cross for Open Crossing Schedule
$5.7

Best-Selling Products

CEPT T/R 34-01
Published Date: 01/01/1987
Specifications Des Equipements Radioelectriques Mobiles Maritimes
$12.6
CEPT T/SF 66 E
Published Date: 01/01/1990
Services and Facilities Aspects of Digital European Cordless Telecommunications (DECT)
$1.5