NR NR/L3/ELP/25000/MODE ISSUE 1 PDF

NR NR/L3/ELP/25000/MODE ISSUE 1 PDF

Name:
NR NR/L3/ELP/25000/MODE ISSUE 1 PDF

Published Date:
09/07/2019

Status:
[ Withdrawn ]

Description:

Electrical Safety Measures for Working on the Operational Railway with Overhead Electrification (Trial Areas Only): Traction Return System and Bonding

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
W/D * PDF ONLY

This module applies only in areas undertaking the trial of the Single Approach to Isolations on 25 kV a.c. infrastructure as set out in the Scope of the main standard. Within the trial areas, this standard supersedes all the requirements of NR/L3/ELP/29987. For all areas not involved in that trial, this standard does not apply and the provisions of the most recent issue of NR/L3/ELP/29987 apply instead.

Within the trial area, this module details the requirements for safe working on or near the traction return system and bonding, including requirements to be implemented when disturbing or replacing broken or disconnected bonds. This module does not include requirements for the design of the traction return or bonding system,

This module applies to Network Rail personnel and to Network Rail’s contractors working within the trial areas, when working on the operational railway with overhead electrification or when working off the operational railway but where the work presents the risk of encroaching within 2.75 m of exposed Live parts.

To provide a consistent approach for working and managing the interfaces between systems and parties, other Railway Group members may, as best practice, apply this module to infrastructure that they control within or adjacent to trial areas.

Further requirements are contained in the Rule Book module AC (GE/RT8000/AC) and Handbook 16 (GE/RT8000/HB16), and in Network Rail’s Lifesaving Rules.


Edition : 1
File Size : 1 file , 410 KB
Number of Pages : 13
Published : 09/07/2019

History


Related products

NR NR/L2/SIG/30017/L ISSUE 1
Published Date: 09/05/2009
Requirements for Level Crossings - Change of Legal Status & Decommissioning of Level Crossings following Closure
$5.7
NR BRS-SM 2397 ISSUE B
Published Date: 10/04/2004
MECHANICALLY OPERATED POINT LAYOUT FP LOCK STRETCHER BAR FOR PLAIN LEADS WITH 113A STOCK AND UIC-54B SWITCH RAILS ON TIMBER BEARERS
$5.7
NR SSI8500H ISSUE 6
Published Date: 09/05/2015
Design of SSI Schemes - Chapter H: Accommodation and Locations
$7.5
NR NR/SIN/161 ISSUE 1
Published Date: 02/20/2017
Permanent Speed Restrictions fitted with TPWS
$7.5

Best-Selling Products