NR NR/L3/ELP/25000/MODF ISSUE 1 PDF

NR NR/L3/ELP/25000/MODF ISSUE 1 PDF

Name:
NR NR/L3/ELP/25000/MODF ISSUE 1 PDF

Published Date:
09/07/2019

Status:
[ Withdrawn ]

Description:

Electrical Safety Measures for Working on the Operational Railway with Overhead Electrification (Trial Areas Only): Contact Details for Electrical Control Operators

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l3-elp-25000-modf-issue-1_2785824

Choose Document Language:
7.50 €
Need Help?
W/D * PDF ONLY

This module applies only in areas undertaking the trial of theSingle Approach to Isolations on 25 kV a.c. infrastructure as set out in theScope of the main standard. Withinthe trial areas, this standard supersedes all the requirements ofNR/L3/ELP/29987. For all areas not involved in that trial, this standard doesnot apply and the provisions of the most recent issue ofNR/L3/ELP/29987 apply instead.

Withinthe trial areas, this module specifies how to contact Electrical ControlOperators in emergency and non-emergency situations.

Thismodule applies to Network Rail personnel and to Network Rail’s contractorsworking within the trial areas, when working on the operational railway withoverhead electrificationor when working off the operational railway but where the work presents therisk of encroaching within 2.75 m of exposed Live parts.

Toprovide a consistent approach for working and managing the interfaces betweensystems and parties, other Railway Group members may, as best practice, applythis moduleto infrastructure they control within or adjacent to trial areas.

Furtherrequirements are contained in the Rule Book module AC (GE/RT8000/AC) andHandbook 16 (GE/RT8000/HB16), and in Network Rail’s Lifesaving Rules.


Edition : 1
File Size : 1 file , 290 KB
Number of Pages : 6
Published : 09/07/2019

History


Related products

NR BRS-SM 3281 ISSUE A
Published Date: 09/10/2015
Machine Operated Point Layout with Tubular Stretcher Bars - NR56 SGVS switches - Mechanical Supplementary Drive Mounted in 4 Foot
5.70 €
NR RT3170 ISSUE 10
Published Date: 11/01/2020
The Guide to Your Personal Track Safety (PTS Handbook)
24.30 €
NR T60047 ISSUE 2
Published Date: 10/07/2005
Lineside & on Track Equipment Typical Circuits Signals- Banner Repeater Signal. Acc: Electronic Interface (POT/CLAM) Peripheral LOC. - LOC. Case Circuit
5.70 €
NR BRS-ST 105 ISSUE C
Published Date: 11/29/1977
Boom Assembly, 13'-1" to 14'-1" Inclusive, Lifting Barrier, (Auto) MK II B including 11'-0" to 13'-0" Length Special Booms
5.70 €

Best-Selling Products

NATO AACP-02.1
Published Date: 07/09/2019
COUNTRY POINTS OF CONTACT
NATO AACP-02
Published Date: 07/09/2019
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS
NATO AACP-1
Published Date: 01/01/1989
GUIDANCE FOR THE DRAFTING OF MOUS AND PROGRAMME MOUS - BASIC CONSIDERATIONS CHECKLIST
NATO AACP-2 VOL 10
Published Date: 02/14/2012
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS - VOLUME 10
NATO AACP-2 VOL 1
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR FEASIBILITY STUDY WORK - VOLUME 1
NATO AACP-2 VOL 2
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR PROJECT DEFINITION AND DESIGN AND DEVELOPMENT - VOLUME 2