Name:
NR NR/L3/ELP/25000/MODG ISSUE 1 PDF
Published Date:
09/07/2019
Status:
[ Withdrawn ]
Publisher:
Network Rail
This module applies only in areas undertaking the trial of the Single Approach to Isolations on 25kV a.c. infrastructure as set out in the Scope of the main standard. Within the trial areas,this standard supersedes all the requirements of NR/L3/ELP/29987. For all areas not involved in that trial, this standard does not apply and the provisions of the most recent issue of NR/L3/ELP/29987 apply instead.
Within the trial areas, this module provides a description of overhead electrification systems, and in particularthe systems of electrification at 25 kV a.c. which are most commonly used on Network Rail infrastructure. Other systems of overhead electrification (such asthe d.c. systems used in certain metro or tram train systems) will be addressed in a future update of this standard.
This module applies to Network Rail personnel and to Network Rail’s contractors working within the trial areas,when working on the operational railway with overhead electrification or when working off the operational railway but where the work presents the risk ofencroaching within 2.75 m of exposed Live parts.
To provide a consistent approach for working and managing the interfaces between systems and parties, other Railway Group members may, as best practice, apply this module to infrastructure they control within or adjacent to trial areas.
Further requirements are contained inthe Rule Book module AC (GE/RT8000/AC) and Handbook 16 (GE/RT8000/HB16), and in Network Rail’s Lifesaving Rules.