NR NR/L3/ELP/27052/02 ISSUE 2 PDF

NR NR/L3/ELP/27052/02 ISSUE 2 PDF

Name:
NR NR/L3/ELP/27052/02 ISSUE 2 PDF

Published Date:
06/05/2021

Status:
[ Revised ]

Description:

Working Instructions for D.C. Electrified Lines on the Northern City Line: General Instructions for Working On or Near Conductor Rail Equipment

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module is applicable to Network Rail personnel, to Network Rail’s contractors and to Train Operating Company personnel.

It covers the general instructions applicable to persons working on or near to the energised conductor rail, how to deal with emergencies and the handling of critical messages concerning the conductor rail system.

Purpose

This module provides instructions for persons working on or near to the 3rd rail d.c. electrified lines between Moorgate and Drayton Park that will enable them carry out their duties without risk of danger from the conductor rail to themselves or other persons.


Edition : 2
File Size : 1 file , 230 KB
Number of Pages : 14
Published : 06/05/2021

History

NR NR/L3/ELP/27052/02 ISSUE 3
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line: General Instructions for Working On or Near Conductor Rail Equipment
$13.2
NR NR/L3/ELP/27052/02 ISSUE 2
Published Date: 06/05/2021
Working Instructions for D.C. Electrified Lines on the Northern City Line: General Instructions for Working On or Near Conductor Rail Equipment
$13.2
NR NR/L3/ELP/27052/02 ISSUE 1
Published Date: 03/07/2020
Working Instructions for D.C. Electrified Lines on the Northern City Line: General Instructions for Working On or Near Conductor Rail Equipment
$13.2

Related products

NR BRS-SE 186/2 ISSUE C
Published Date: 02/12/1993
Flashing Warning Road Lights Backboard, high visibility at Narrow Central Reserves
$5.7
NR NR/L2/SIGELP/27418/MOD B ISSUE 1
Published Date: 09/05/2015
Design, Installation and Testing of Earthing in Signalling Power Systems: Earth Mat Installation Process
$5.7
NR BRS-SM 2361 ISSUE A
Published Date: 01/10/1994
Point Identification Baseplate
$5.7
NR AWS 10
Published Date: 03/01/1987
Standard and Extra Strength Permanent Magnets for AWS and Temporary Speed Restrictions
$7.5

Best-Selling Products

DIN 10 - DRAFT
Published Date: 12/01/2008
Draft Document - Squares of parallel shanks for rotating tools
$11.118
DIN 10050-3
Published Date: 09/01/1999
Testing of butter wrappers - Part 3: Colony count
$15.696
DIN 10050-4
Published Date: 12/01/1973
Testing of butter wrappers; determination of resistance against delamination
$7.848
DIN 10050-5
Published Date: 09/01/1999
Testing of butter wrappers - Part 5: Determination of fat stability of the surface contacting the butter during continuous charge
$13.407
DIN 10050-7
Published Date: 12/01/1973
Testing of butter wrappers, determination of water soluble components of the surface of the wrapper contacting butter
$7.848
DIN 10050-8
Published Date: 09/01/1999
Testing of butter wrappers - Part 8: Determination of water insoluble sodium chloride free ash
$13.407