NR NR/L3/ELP/27052/05 ISSUE 1 PDF

NR NR/L3/ELP/27052/05 ISSUE 1 PDF

Name:
NR NR/L3/ELP/27052/05 ISSUE 1 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Working Instructions for D.C. Electrified Lines on the Northern City Line: Engineering Work and Obstruction of the Line within the Tunnel

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
PDF ONLY

This module is applicable to Network Rail personnel, to Network Rail’s contractors and to Train Operating Company personnel.

It covers the procedures and processes requires for the conduct of engineering works in the tunnels between Moorgate and Drayton Park, including the operation of engineering trains.

Purpose

This module provides instructions for persons working on or near to the 3rd rail d.c. electrified lines between Moorgate and Drayton Park that will enable them carry out their duties without risk of danger from the conductor rail to themselves or other persons.


Edition : 1
File Size : 1 file , 120 KB
Number of Pages : 5
Published : 03/07/2020

History

NR NR/L3/ELP/27052/05 ISSUE 3
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line: Engineering Work and Obstruction of the Line Within the Tunnel
$5.7
NR NR/L3/ELP/27052/05 ISSUE 2
Published Date: 06/04/2022
Working Instructions for D.C. Electrified Lines on the Northern City Line: Engineering Work and Obstruction of the Line Within the Tunnel
$5.7
NR NR/L3/ELP/27052/05 ISSUE 1
Published Date: 03/07/2020
Working Instructions for D.C. Electrified Lines on the Northern City Line: Engineering Work and Obstruction of the Line within the Tunnel
$5.7

Related products

NR NR/L2/RSE/02009/01 ISSUE 3
Published Date: 03/04/2023
Engineering Management for Projects: Assessment for Project Engineering Roles
$18.6
NR NR/L3/MTC/EN0123 ISSUE 2
Published Date: 06/01/2008
Environmental Management System for Maintenance
$13.2
NR BRS-SE 5050/2 ISSUE D
Published Date: 11/01/1994
Electric Point Detector Assemblies BRS-SE 50/1-5 (Inclusive)
$5.7
NR NR/CIV/SD/2164-1 ISSUE B
Published Date: 04/27/2012
Conarch Overbridge: Reinforcement Details 9.4m External Unit Left Skew 45º
$5.7

Best-Selling Products