NR NR/L3/ELP/27052/07 ISSUE 1 PDF

NR NR/L3/ELP/27052/07 ISSUE 1 PDF

Name:
NR NR/L3/ELP/27052/07 ISSUE 1 PDF

Published Date:
03/07/2020

Status:
[ Revised ]

Description:

Working Instructions for D.C. Electrified Lines on the Northern City Line: Station Emergency Evacuation Instructions

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.2
Need Help?
PDF ONLY

This module is applicable to Network Rail personnel, to Network Rail’s contractors and to Train Operating Company personnel.

Purpose

This module updates previously published instructions for 3rd rail d.c. electrified lines between Moorgate and Drayton Park (the Northern City Line), presenting them in an approved format that clarifies where variation may be permitted.

This module provides instructions for persons in regard to the evacuation of a station or a train.


Edition : 1
File Size : 1 file , 240 KB
Number of Pages : 15
Published : 03/07/2020

History

NR NR/L3/ELP/27052/07 ISSUE 3
Published Date: 03/04/2023
Working Instructions for D.C. Electrified Lines on the Northern City Line: Station Emergency Evacuation Instructions
$13.2
NR NR/L3/ELP/27052/07 ISSUE 2
Published Date: 06/05/2021
Working Instructions for D.C. Electrified Lines on the Northern City Line: Station Emergency Evacuation Instructions
$13.2
NR NR/L3/ELP/27052/07 ISSUE 1
Published Date: 03/07/2020
Working Instructions for D.C. Electrified Lines on the Northern City Line: Station Emergency Evacuation Instructions
$13.2

Related products

NR TWI 3P039 ISSUE 1
Published Date: 03/01/2005
How to Manage Rails in Tunnels
$5.7
NR BRS-SM 57/1
Published Date: 06/25/1974
Colour Light Signals Spacer Block for Top Channel Mounting Bracket
$5.7
NR NR/L3/SIGELP/50001/SPS M005 ISSUE 3
Published Date: 12/02/2023
Signalling Power Distribution Equipment above 175 V (Work Instructions): Interrupter Cables Management and Maintenance
$7.5
NR NR/L3/OHS/005/05/F01 ISSUE 2
Published Date: 06/04/2022
Design and Construction Management in a High Street Environment: Car Park Away from Track, Does Not Service Station - Diagram
$5.7

Best-Selling Products

FCI 13-1-2022
Published Date: 2022
Determining Condensate Loads to Size Steam Traps
$66
FCI 15-1-2020
Published Date: 2020
Standard for Production Testing of Pressure Regulators
$49.5
FCI 17-1-2018
Published Date: 10/01/2018
Standard for Production Testing of Sanitary Pressure Regulators
$33
FCI 18-1-2021
Published Date: 2021
Standard for Sizing and Selection of Type 1 Secondary Pressure Drainers
$33
FCI 18-2-2020
Published Date: 2020
Standard for Installation of Type 1 Secondary Pressure Drainers
$33