Name:
NR NR/L3/ELP/27122 ISSUE 3 PDF
Published Date:
06/01/2008
Status:
[ Active ]
Publisher:
Network Rail
General
This instruction applies to switchgear operating at 11kV and above. If the High Voltage (HV) supply is lost or a HV circuit breaker operates for no known reason in a building equipped with Metal Clad Switchgear with Bitumastic Compound Filled Busbar Chambers and staff are present at that location, the following instructions shall be carried out. A list of Substations where this instruction is applicable shall be produced within each Maintenance Delivery Unit by Maintenance Engineer (E&P) or representative and made available in the appropriate Electrical Control Room Instructions.
| Edition : | 3 |
| File Size : | 1 file , 340 KB |
| Number of Pages : | 5 |
| Published : | 06/01/2008 |