NR NR/L3/ELP/27240/NR/DIST C10M(A) ISSUE 3 PDF

NR NR/L3/ELP/27240/NR/DIST C10M(A) ISSUE 3 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C10M(A) ISSUE 3 PDF

Published Date:
03/01/2017

Status:
[ Active ]

Description:

Routine Inspection and Secondary Injection Testing of LFZP 141 Optimho Relay Using ORTS 50 Test Set (For K11 Locations refer to NR/DIST C10a)

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L3/ELP/27240/NR/DIST C10M(A)

Includes: LFZP 141 Optimho distance protection relay

Excludes: Locations with K11 25kV switchgear


Edition : 3
File Size : 1 file , 77 KB
Number of Pages : 4
Published : 03/01/2017

History


Related products

NR BRS-ST 69
Published Date:
Location Cupboards Concrete Base Details
$5.7
NR NR/L3/MTC/0004 ISSUE 5
Published Date: 09/05/2009
Risk Control Sheet Manual: Distribution & Plant
$7.5
NR NR/L2/SIG/30014/D120/TS5-66 ISSUE 2
Published Date: 12/05/2020
Signalling Works Testing Handbook: Frauscher FAdC R1 and R2 Axle Counter Evaluator System Test Specification
$7.5
NR NR/L2/CTM/012/008 ISSUE 1
Published Date: 03/06/2010
SIG 08: Undertake Corrective and Preventative Maintenance of Mechanical Signals and AWS Equipment
$7.5

Best-Selling Products

SFSA 3
Published Date: 01/01/1976
Ultrasonic Testing of Steel Castings
$0.3
SFSA 4
Published Date: 01/01/1979
Fracture Toughness in Relation to Steel Castings Design and Application
$0.3
SFSA 5
Published Date: 01/01/1964
Solidification of Steel Castings
$15
SFSA 6
Published Date: 01/01/1973
Steel Foundry Melting Practice
$15
SFSA 7
Published Date: 01/01/1982
Gating and Risering
$15
SFSA 8
Published Date: 01/01/1984
Steel Casting Metallurgy
$15