NR NR/L3/ELP/27240/NR/DIST C14 ISSUE 4 PDF

NR NR/L3/ELP/27240/NR/DIST C14 ISSUE 4 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C14 ISSUE 4 PDF

Published Date:
03/02/2019

Status:
[ Active ]

Description:

Maintenance of Micom P142 Protection Relay

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L3/ELP/27240/NR/DIST C14

Includes: Areva P142, Schnieder P142, GE P142 & Alstom P142. For single phase 25 kV only


Edition : 4
File Size : 1 file , 230 KB
Number of Pages : 5
Published : 03/02/2019

History


Related products

NR NB 198 ISSUE 1
Published Date: 12/16/2020
NR/L2/SIG/30035 - Signalling and Level Crossing Scheme Review Arrangements from January 2021
$5.7
NR SMF/EP/0245 ISSUE 10
Published Date: 10/01/2010
Work On or Adjacent to Conductor Rail: Risk Level Ratings for Ellipse Standard Jobs
$5.7
NR RT/E/WI/27093 ISSUE 1
Published Date: 12/04/2004
Installation of Overhead Line Equipment, Planted & Bolted Base Side Bearing Foundations (aka NR/WI/ELP/27093)
$18.6
NR NR/L3/TRK/3406/01 ISSUE 2
Published Date: 03/06/2021
Design, Installation and Maintenance of Modular Bearer Joints: Design and Positioning of Bearer Joints in Modular Switch and Crossing Layouts
$13.2

Best-Selling Products

NATO AACP-02.1
Published Date: 07/09/2019
COUNTRY POINTS OF CONTACT
NATO AACP-02
Published Date: 07/09/2019
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS
NATO AACP-1
Published Date: 01/01/1989
GUIDANCE FOR THE DRAFTING OF MOUS AND PROGRAMME MOUS - BASIC CONSIDERATIONS CHECKLIST
NATO AACP-2 VOL 10
Published Date: 02/14/2012
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS - VOLUME 10
NATO AACP-2 VOL 1
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR FEASIBILITY STUDY WORK - VOLUME 1
NATO AACP-2 VOL 2
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR PROJECT DEFINITION AND DESIGN AND DEVELOPMENT - VOLUME 2