NR NR/L3/ELP/27240/NR/DIST C16G ISSUE 3 PDF

NR NR/L3/ELP/27240/NR/DIST C16G ISSUE 3 PDF

Name:
NR NR/L3/ELP/27240/NR/DIST C16G ISSUE 3 PDF

Published Date:
03/01/2017

Status:
[ Active ]

Description:

Isolation and Earthing for Feeder Switch Maintenance for A.C. Electrified Lines

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.7
Need Help?
NR/L3/ELP/27240/NR/DIST C16G

Includes: This Instruction details the additional isolation and earthing requirements necessary to carry out the maintenance of O.L.E. feeder switches. These switches are, for the purpose of this document, defined as those switches which are immediately on the O.L.E. side of a C.B.


Edition : 3
File Size : 1 file , 22 KB
Number of Pages : 2
Published : 03/01/2017

History


Related products

NR SSIDIS178 ISSUE 2
Published Date: 03/20/2013
Splitting Distant and Flashing Aspect Signals: Data Corrections
$7.5
NR NR/CIV/SD/FORMA/690 ISSUE A01
Published Date: 06/14/2013
Form A: Generic Foundation Design for OLE Support Structures
$24.3
NR NR/L2/SIG/11201/MOD A3-3 ISSUE 4
Published Date: 09/07/2024
Signalling Design Handbook: Signalling Scheme Plans
$24.3
NR BRS-SM 440/07 ISSUE A
Published Date: 09/22/1995
Standard Apparatus Case G.A. of Large Case Framework Typical Example of AC TRs/SSI Equipment
$5.7

Best-Selling Products