Name:
NR NR/L3/ELP/27240/NR/DIST C16G ISSUE 3 PDF
Published Date:
03/01/2017
Status:
[ Active ]
Publisher:
Network Rail
Includes: This Instruction details the additional isolation and earthing requirements necessary to carry out the maintenance of O.L.E. feeder switches. These switches are, for the purpose of this document, defined as those switches which are immediately on the O.L.E. side of a C.B.
| Edition : | 3 |
| File Size : | 1 file , 22 KB |
| Number of Pages : | 2 |
| Published : | 03/01/2017 |