Name:
NR NR/L3/ELP/27240/NR/DIST C16H ISSUE 4 PDF
Published Date:
03/02/2019
Status:
[ Active ]
Publisher:
Network Rail
Includes: The following instructions apply only to the 25kV Hackney Downs No. 2 TSC in connection with the issue and cancellation of High Voltage Permits to Work or Sanctions for Test, to enable work/testing to be carried out on this equipment or the connections thereto.
Excludes: All other 25kV switching stations
| Edition : | 4 |
| File Size : | 1 file , 130 KB |
| Number of Pages : | 9 |
| Published : | 03/02/2019 |